Hi i have been on the black stuff for 25 years now and in that time i have done a few concrete jobs.
My question is I have a 60sqm slab to concrete (drive) I am getting it conveyerd in and wanted to know how long i have to work this concrete
Kind regards
Loudog

cookiewales
Posts: 1270
Joined: Mon Aug 10, 2009 8:30 am
Location: york work anywhere where the stone takes me
Contact:

Post: # 49825Post cookiewales

loudog wrote:Hi i have been on the black stuff for 25 years now and in that time i have done a few concrete jobs.
My question is I have a 60sqm slab to concrete (drive) I am getting it conveyed in and wanted to know how long i have to work this concrete
Kind regards
Lou Dog
in these temperatures you dont get long dont just dump it all in start from one end level as you go dont let them them rush you you will need at least 2 other helpers who know what there doing :;):
Originalstonepaving.com

The very best in natural stone paving in new and reclaimed materials
M: 07968 582231

loudog
Posts: 214
Joined: Wed Jan 02, 2008 12:59 pm
Location: mells

Post: # 49830Post loudog

hi yeah thanks for the quick reply mate, there is 3 of us all together, shuttering all in, would i have a couple of hours do you think

cookiewales
Posts: 1270
Joined: Mon Aug 10, 2009 8:30 am
Location: york work anywhere where the stone takes me
Contact:

Post: # 49832Post cookiewales

loudog wrote:hi yeah thanks for the quick reply mate, there is 3 of us all together, shuttering all in, would i have a couple of hours do you think
yep but well prepared and ready is the key when it goes its gone even trying to add water later is a fail good luck :;):
Originalstonepaving.com

The very best in natural stone paving in new and reclaimed materials
M: 07968 582231

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 49838Post lutonlagerlout

well if its 60 m at 100 mm thick thats 6 M3 the barrowmix crowd we use allow 40 minutes per metre barrowed but normally its more like 20 minutes per metre when access is close.
as cookie rights says dont let them rush you in to taking it in 1 big heap
2 lads barrowing and 1 levelling (we did 2 metres this afternoon but it was a 100M walk to the shed base)and we did it in an hour
most important thing is the slump,
too wet and you will be there till dark
too dry and it wont trowel up for love nor money
all the best
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

loudog
Posts: 214
Joined: Wed Jan 02, 2008 12:59 pm
Location: mells

Post: # 49864Post loudog

thanks for all your comments, i am having a conveyer belt so wont be barrowing it which will give me a bit extra time

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 49865Post lutonlagerlout

the barrow mix people we use has a kind of conveyor
seen here the main thing is have it at your own pace.
i hate shovelling crete as its curing

the readymix drivers all fell out of the ignorant tree and hit every branch on the way down :;):
good luck lou
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

cookiewales
Posts: 1270
Joined: Mon Aug 10, 2009 8:30 am
Location: york work anywhere where the stone takes me
Contact:

Post: # 49866Post cookiewales

lutonlagerlout wrote:the barrow mix people we use has a kind of conveyor
seen here the main thing is have it at your own pace.
i hate shovelling crete as its curing

the readymix drivers all fell out of the ignorant tree and hit every branch on the way down :;):
good luck lou
LLL
very well said luton when they start there spiel only got 30 mins need to dump it . i normaly say dont bother take it back that cures them :;): :;):
Originalstonepaving.com

The very best in natural stone paving in new and reclaimed materials
M: 07968 582231

Post Reply