I am laying a new patio 6m X 7m the soil is very compacted with lots of old building and demolition bricks and concrete in it, the patio will only have people on it no traffic of any kind except maybe my grandson in his electric car, what i need help with is the slab I am looking at laying a slab of ready mix on the compacted soil with a DPC will 50mm deep be okay if so what strength should i get, and will I need any form of expantion joint
Thanks

cookiewales
Posts: 1270
Joined: Mon Aug 10, 2009 8:30 am
Location: york work anywhere where the stone takes me
Contact:

Post: # 48552Post cookiewales

x1/9Dave wrote:I am laying a new patio 6m X 7m the soil is very compacted with lots of old building and demolition bricks and concrete in it, the patio will only have people on it no traffic of any kind except maybe my grandson in his electric car, what i need help with is the slab I am looking at laying a slab of ready mix on the compacted soil with a DPC will 50mm deep be okay if so what strength should i get, and will I need any form of expantion joint
Thanks
100mm minimum soil is not a good base use wet concrete with some steel mesh then no need to have expansion joints expect up against building put your fall in the base will make job easier :;):
Originalstonepaving.com

The very best in natural stone paving in new and reclaimed materials
M: 07968 582231

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 48561Post dig dug dan

Woa! are you laying the concrete as the final surface, or is it to then lay the slabs on?
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

x1/9Dave
Posts: 3
Joined: Tue May 04, 2010 3:30 pm
Location: Great Yarmouth

Post: # 48565Post x1/9Dave

dig dug dan wrote:Woa! are you laying the concrete as the final surface, or is it to then lay the slabs on?

My idea was to lay the concrete let is set and then lay slabs on top with a morter bond between any better ideas will be very welcome

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 48567Post dig dug dan

My idea was to lay the concrete let is set and then lay slabs on top with a morter bond between any better ideas will be very welcome


thats what i was afraid of.
This method is way over the top, and a costly option.

All you need to do is lay crushed concrete or type one,compact it, then slab on top of that. It will be fine for a patio.

Unless you plan to park a car on it, i wouldn't be too concerned.
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 48568Post dig dug dan

no need to have expansion joints


not so. You will need expansion joints when you go over a certain size slab. the slab will still crack otherwise.

Drive round the southern section of the M25, and all the concrete has expansion joints!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

cookiewales
Posts: 1270
Joined: Mon Aug 10, 2009 8:30 am
Location: york work anywhere where the stone takes me
Contact:

Post: # 48569Post cookiewales

dig dug dan wrote:
My idea was to lay the concrete let is set and then lay slabs on top with a morter bond between any better ideas will be very welcome


thats what i was afraid of.
This method is way over the top, and a costly option.

All you need to do is lay crushed concrete or type one,compact it, then slab on top of that. It will be fine for a patio.

Unless you plan to park a car on it, i wouldn't be too concerned.

concrete slab is way over the top but not if your puting it on top of crap ground and a 42m2 slab with mesh will not crack on a patio i would dig out and put in proper base you need to weigh up the cost and time saving or get the pro guys in 4.5 cubes plus mesh 650 pounds approx good luck :;):materials only




Edited By cookiewales on 1273002593
Originalstonepaving.com

The very best in natural stone paving in new and reclaimed materials
M: 07968 582231

x1/9Dave
Posts: 3
Joined: Tue May 04, 2010 3:30 pm
Location: Great Yarmouth

Post: # 48577Post x1/9Dave

cookiewales wrote:
dig dug dan wrote:
My idea was to lay the concrete let is set and then lay slabs on top with a morter bond between any better ideas will be very welcome


thats what i was afraid of.
This method is way over the top, and a costly option.

All you need to do is lay crushed concrete or type one,compact it, then slab on top of that. It will be fine for a patio.

Unless you plan to park a car on it, i wouldn't be too concerned.

concrete slab is way over the top but not if your puting it on top of crap ground and a 42m2 slab with mesh will not crack on a patio i would dig out and put in proper base you need to weigh up the cost and time saving or get the pro guys in 4.5 cubes plus mesh 650 pounds approx good luck :;):materials only

cookiewales thanks for your answer mate sorry to be a numpty, done lots of site work sparky though not used to patio laying but how would you lay a proper base
Thanks again
Dave

cookiewales
Posts: 1270
Joined: Mon Aug 10, 2009 8:30 am
Location: york work anywhere where the stone takes me
Contact:

Post: # 48581Post cookiewales

hi dave look under heading for base for patios all the info is there and correct . you need to go down to sub soil to start and take into account damp course 150mm min below then upto 200mm below that then base sand cement then paving all this is in the main index and am sure you will do a good job concrete base is good for bad ground or very wet clay then lean mix is good often use this in the winter or when raining as we travel so much down time costs money so extra for concrete is okay.a example we pointed a driveway 4x4 sets 110m2 with instermac flow point nine pound fifty per bag 64 bags used pointed and cleaned of six hours 3men slurry pointing would be 12 hours plus over 2 or three days so to me there is no saving useing slurry when you can be earning elsewhere.big plus open to foottrafic 2 hours cars next day.good luck with the patio :;): :cool: