Hi
Just registered on this very informative website. But need some advise/help.
the contractor i have to do my block paving seems to be working back to front!! he has done the sub-base, then put the membrane and now he has completely broken my drain and the pipe leading into the manhole!! also some of the subbase still has largish lumps in it which i don't think is right.I also asked him to put the lighting cables under the sub base...didn't dothis and now he has had to dig that area up again to do it which means it hasn't been compacted.he has also just put the membrane back down.. plus i also don't hink there is enough sub base on the entry of the drive. I have seen his portfolio and he keeps saying don't worry the end product will be ok.we have also rung up his previous clients and they seemed positive about him. good thing is i don't have to pay him until the job is completed which makes a change these days....
any advise welcome...thanks
Just registered on this very informative website. But need some advise/help.
the contractor i have to do my block paving seems to be working back to front!! he has done the sub-base, then put the membrane and now he has completely broken my drain and the pipe leading into the manhole!! also some of the subbase still has largish lumps in it which i don't think is right.I also asked him to put the lighting cables under the sub base...didn't dothis and now he has had to dig that area up again to do it which means it hasn't been compacted.he has also just put the membrane back down.. plus i also don't hink there is enough sub base on the entry of the drive. I have seen his portfolio and he keeps saying don't worry the end product will be ok.we have also rung up his previous clients and they seemed positive about him. good thing is i don't have to pay him until the job is completed which makes a change these days....
any advise welcome...thanks
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
Sounds like a cowboy to say the least-
Membrane should be below the type1 sub-base,any where else it is useless
150mm sub-base is what you should be looking for with no lumps type 1 should be no bigger than 40mm to dust
cable should have been in first,with sand surrounding it for damage from stone protection and marker tape over it 4" from cable
Have you give him any payment yet,if so don't give anymore
you tell him your not happy and what it changing,
read through the main site all you need is there
all you need to know read me please
im all about membrane
Hope this helps MSH
Membrane should be below the type1 sub-base,any where else it is useless
150mm sub-base is what you should be looking for with no lumps type 1 should be no bigger than 40mm to dust
cable should have been in first,with sand surrounding it for damage from stone protection and marker tape over it 4" from cable
Have you give him any payment yet,if so don't give anymore
you tell him your not happy and what it changing,
read through the main site all you need is there
all you need to know read me please
im all about membrane
Hope this helps MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
rosy explain you concerns and give him the opportunity to put it right
the fact that he is recommended by other seems good from here,also the fact he doesn't want money till the job is done is a good sign
the broken pipe needs fixing and membrane isnt really necessary on a light use domestic drive *by membrane I mean geo textile*
sleep well
LLL
the fact that he is recommended by other seems good from here,also the fact he doesn't want money till the job is done is a good sign
the broken pipe needs fixing and membrane isnt really necessary on a light use domestic drive *by membrane I mean geo textile*
sleep well
LLL
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
be strong in your conviction and don;t let him fluster you with tech talk etc so you back down and leave him alone, print out the spec off here (structural diagram) and show it to him if he says he has his own way of doing it etc you know he's doing it wrong.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 10
- Joined: Wed Feb 24, 2010 5:04 pm
- Location: surrey
-
- Posts: 420
- Joined: Mon Jun 29, 2009 11:14 pm
- Location: uk
I always lay channels before i lay any blocks. The channels need to be haunched with concrete to keep them in place then you block pave up to the channel.
I would advise to get some pics up Rosy asap so we can see whats going on here asap. But reading your posts imo i'd be a bit concerned.
I would advise to get some pics up Rosy asap so we can see whats going on here asap. But reading your posts imo i'd be a bit concerned.
"I'm spending a year dead for tax reasons."
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
how the hell can you put the drainage in at the end? as Irish says, you lay the drainage first , the block up to it.
sounds very unusual to me.... ???
sounds very unusual to me.... ???
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
-
- Posts: 934
- Joined: Tue Nov 01, 2005 10:57 pm
- Location: Buckinghamshire
- Contact:
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
they go in first as they set the finished height at the lowest point of the driveway for the block paving and gives you a nice striaght edge to work too
the channel needs to be connected to a soak a way via a underground drainage pipe which can have an overflow pipe connected to the existing rain water drainage system, 9 times out of 10 the drain will be underneath the block paving what your contractor has just laid so he would have to take up part of the driveway to install the drains
if the underground drainage pipe is within the area of your driveway then it needs to be encased in a weak mix concrete to stabilise the ground around this pipe.
its not rocket science just common sense
the channel needs to be connected to a soak a way via a underground drainage pipe which can have an overflow pipe connected to the existing rain water drainage system, 9 times out of 10 the drain will be underneath the block paving what your contractor has just laid so he would have to take up part of the driveway to install the drains
if the underground drainage pipe is within the area of your driveway then it needs to be encased in a weak mix concrete to stabilise the ground around this pipe.
its not rocket science just common sense
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways