Labour cost per metre for indian sandstone
-
- Posts: 3
- Joined: Mon Mar 01, 2010 3:03 pm
- Location: Wigan
Hi guys, I have worked as a flagger for nearly 10years for a local firm but have Recently been laid off.
Did a job a while back (for the firm) on a house, Indian Sandstone round the back. The client has since seen me around town and has asked how much would it be to continue it all round and up the driveway to the road.
Almost certain to have the job but unsure as to what is the going rate per metre as I never was involed in the pricing of jobs for the firm.
I sort of know how long the preping going to take but have no idea on metreage labour price.
So has anybody any idea of the going rate in the North West?
Thanks...
Did a job a while back (for the firm) on a house, Indian Sandstone round the back. The client has since seen me around town and has asked how much would it be to continue it all round and up the driveway to the road.
Almost certain to have the job but unsure as to what is the going rate per metre as I never was involed in the pricing of jobs for the firm.
I sort of know how long the preping going to take but have no idea on metreage labour price.
So has anybody any idea of the going rate in the North West?
Thanks...
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
you seem to indicate that your flagging the drive, so you'll need to bed them on 100mm concrete which will add to the cost.
tony not far out with his price, i'm south manchester last job i did was about 90/m all in with romex pointing
tony not far out with his price, i'm south manchester last job i did was about 90/m all in with romex pointing
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
90 to 100 supply and lay is about right for a good job ps always do a good job its the only way :;): :;):GB_Groundworks wrote:you seem to indicate that your flagging the drive, so you'll need to bed them on 100mm concrete which will add to the cost.
tony not far out with his price, i'm south manchester last job i did was about 90/m all in with romex pointing
Originalstonepaving.com
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
how much do you want a day?
how much can you reasonably lay in a day on your own
divide the top by the bottom = your labour rate
Edited By GB_Groundworks on 1267552486
how much can you reasonably lay in a day on your own
divide the top by the bottom = your labour rate
Edited By GB_Groundworks on 1267552486
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire