Post: # 45715Post ronnie111

what is the allowed tollerance the contractor says he can cut out areas and patch them up is this correct
ronnie

cookiewales
Posts: 1270
Joined: Mon Aug 10, 2009 8:30 am
Location: york work anywhere where the stone takes me
Contact:

Post: # 45716Post cookiewales

ronnie111 wrote:what is the allowed tollerance the contractor says he can cut out areas and patch them up is this correct
am sure one off the tarmac boys will be along soon ???
Originalstonepaving.com

The very best in natural stone paving in new and reclaimed materials
M: 07968 582231

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 45720Post Tony McC

On a private driveway, there is no tolerance of standing water, and bear in mind that any patching will stand out like the proverbial sore thumb.
Site Agent - Pavingexpert

buddyt
Posts: 1
Joined: Sun Jan 31, 2010 12:38 pm
Location: bristol

Post: # 45721Post buddyt

be careful with this one we had a drive done by a local contractor small puddles appeared 3 infact went to court surveyor passed the drive as puddles were very shallow ie only 7mm deep at worst

suprised us and cost us £300 on top for court fees and surveyor

dave wilks
Posts: 5
Joined: Sun Jan 31, 2010 12:48 pm
Location: reading

Post: # 45722Post dave wilks

can agree with the above we live on a private development built by persimmon several of our drives in the street started to sink a little, contractor came back and patched them we were not happy and continued to small claims court judge rules the repairs are fit for purpose and rules in favour of the contractor

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 45723Post Tony McC

That's what happens when they get a surveyor instead of a paving or surfacing specialist.

Back in the mists of time when I was doing my training, the standard used on public highways was a 1p coin. If the water in a puddle was deeper than the coin (3mm) the area had to be resurfaced.

I'm a bit out of touch with blacktop regs nowadays, but I'm pretty sure that a 7mm puddle would never pass muster.
Site Agent - Pavingexpert

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 45724Post Tony McC

Fit for purpose: I've come across this on a few occasions and it's possible to make a case that a residential driveway is more than a utilitarian structure that simply needs to be 'fit for purpose' but has to meet a minimum aesthetic standard as it is an improvement or adornment to a property.

Admittedly, it would be hard to make this argument on a new build where the builder/developer installs a blacktop driveway as an access and parking feature, but when a re-surfacing has been commissioned, the client almost always expects a high standard of finish that will enhance the value of their property, and not something that is simply 'fit for purpose'.

Again, it comes back to the comment I made in the previous post which seems to have been submitted almost simultaneously with that of dave wilks poster, surveyors are not always the best persons to make judgements on pavements which are specialist constructions outside their day-to-day remit. They may be fine commenting on vertical masonry, roofs, flashings or window casements, but very, very few of them have any practical training or experience with paving and even fewer with blacktop surfacing.
Site Agent - Pavingexpert

dave wilks
Posts: 5
Joined: Sun Jan 31, 2010 12:48 pm
Location: reading

Post: # 45725Post dave wilks

done a bit of research looks like the spec is + - 6mm does that mean 12mm overall?

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 45727Post GB_Groundworks

no it means can be high 6mm or low 6mm
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 45746Post Dave_L

Pics of the puddles would help - but there is no excuse for puddles on a new construction driveway.

Yes, you might have to deal with slack falls & levels but there is always a way of shaping the drive to get the water off it. This is where aco drainage is so so useful.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

dave wilks
Posts: 5
Joined: Sun Jan 31, 2010 12:48 pm
Location: reading

Post: # 45754Post dave wilks

dave

does that mean if you pave a car park and their is a small puddle the client makes yoou rip up the entire car patk ?

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 45755Post Dave_L

What I meant there is no excuse for puddles on a NEW driveway - as falls and levels can be factored in etc - but on overlay work, it sometimes cannot be helped but it can be minimised by accurate regualting course work.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Colin James
Posts: 47
Joined: Fri Oct 24, 2008 12:30 pm
Location: Glasgow

Post: # 45784Post Colin James

I have had to research this my self and below are extracts from two British Standards.

BS 594-2:2003

10 Surface regularity
For machine laid work, the longitudinal regularity, and transverse regularity on straight cross-falls, of finished surfaces shall be such that the maximum depression, measured under a 3 m straightedge placed parallel to or at right angles to the centre-line of the carriageway, shall not exceed 5 mm for surface courses, 10 mm for binder courses and 14 mm for bases (roadbases).

BS 4987-2:2003
Coated macadam (asphalt concrete) for roads and other paved areas —
Part 2: Specification for transport, laying and compaction
When the coated macadam is laid on a surface prepared in accordance with Clause 5, the new road surface, on completion of rolling, shall conform to the required levels and shape within the tolerances given in Table 7.
Table 7 — Accuracy of finish


Coated macadam Maximum permissible depth of the gap beneath a 3 m straightedge used longitudinally or a template used transversely
Machine laid
mm Hand laid
mm

Base (roadbase) 25 25
Binder course 13 13
Surface course 7 10
NOTE 1 The finished surface should be laid as follows unless specified otherwise.
a) Cross-fall. In the case of roads with a straight cross-fall this fall should be not steeper than 3 % nor flatter than 2 %.
b) Camber. With roads to be cambered, the average fall of the finished surface from the crown to the channel should not be more than 3 % nor less than 2 %.
c) Longitudinal fall. Longitudinal drainage falls in the channel should have a gradient no flatter than 0.8 %.
NOTE 2 As a means of ensuring reasonable riding quality after patching operations the surface of the compacted patch should be flush with or slightly proud of the surrounding surface; it should not be left below the surrounding level, otherwise ponding will occur.

Regards,
Colin.
C. J. Cranwell

dave wilks
Posts: 5
Joined: Sun Jan 31, 2010 12:48 pm
Location: reading

Post: # 45785Post dave wilks

so it looks like 10mm is standard for hand lay, thats a big tollerrence, no wonder we lost our case

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 45788Post rab1

the problem with persimmon or any other large house builder is that 95% percent of the people buying from them know feck all about building regs and just accept what their told.

personally used to enjoy my chats with their (persimmon) site agent as he quoted "its within tolerance" too me on a regular basis. in the end they changed/repaired a lot of things but only once he found out i`ve been in the construction game for 20yrs & mrs rab is a charted surveyor.