A little help
-
- Posts: 91
- Joined: Sun Jan 10, 2010 5:32 pm
- Location: Ashford, Kent
right me back again annoying everyone, ''that'' job with the decking also has some patio in it, can someone check my pricing rate on it roughly for me please and give some feedback?
53m2 total area
10.7 tonnes mot @ £581.23
4.1 ton sharp @ £253.68
795kg cement @ £140.25
150 slabs 600x600 @ £1487.71
2guys 3 days labour @ £900
10% on materials @ £2709.15
total £3609.15
seem a reasonable price? sounds a lot to me but you guys have the know how
thanks
53m2 total area
10.7 tonnes mot @ £581.23
4.1 ton sharp @ £253.68
795kg cement @ £140.25
150 slabs 600x600 @ £1487.71
2guys 3 days labour @ £900
10% on materials @ £2709.15
total £3609.15
seem a reasonable price? sounds a lot to me but you guys have the know how
thanks
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
not a million miles out but not knowing who else is pricing for the work, and your area's rates MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
mot £58 a ton.......... bulk its 9.90 plus vat, loose bagged at worst £35 at the very worst
63 a ton for sharp sand ouch
£7 a bag for cement
i feel for you, are buying these from b & q
doing it off travis trademate website i get this, so glad i get my aggregates bulk or loose and not bagged ouch. plus factor in an upto 50% discount. but your not far off, what you using for slabs/flags?
Code Product Quantity Cost Per Total
554644 OLD RIVEN PAVING 600X600 BRADSTONE AUTUMN COTSWOLD 150 £10.58 EA £1,586.25
846581 BLUE CIRCLE CEMENT GREY 25KG NOMINAL 32 £4.66 BG £149.27
938208 SHARP/GRIT SAND BULK BAG 5 £41.43 BG £207.15
938251 MOT TYPE 1 BULK BAG 11 £37.47 BG £412.18
All prices include VAT
Sub Total £2,354.85
VAT Content £350.72
Total £2,354.85
Edited By GB_Groundworks on 1264019072
63 a ton for sharp sand ouch
£7 a bag for cement
i feel for you, are buying these from b & q
doing it off travis trademate website i get this, so glad i get my aggregates bulk or loose and not bagged ouch. plus factor in an upto 50% discount. but your not far off, what you using for slabs/flags?
Code Product Quantity Cost Per Total
554644 OLD RIVEN PAVING 600X600 BRADSTONE AUTUMN COTSWOLD 150 £10.58 EA £1,586.25
846581 BLUE CIRCLE CEMENT GREY 25KG NOMINAL 32 £4.66 BG £149.27
938208 SHARP/GRIT SAND BULK BAG 5 £41.43 BG £207.15
938251 MOT TYPE 1 BULK BAG 11 £37.47 BG £412.18
All prices include VAT
Sub Total £2,354.85
VAT Content £350.72
Total £2,354.85
Edited By GB_Groundworks on 1264019072
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 91
- Joined: Sun Jan 10, 2010 5:32 pm
- Location: Ashford, Kent
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
Giles i pay £14 to 17 a ton for bulk type1 in norfolk as it all has to be roaded in , type 1 crush concrete, tarmac plannings are all in that price range MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
the advantage of living in the hilly bit of the world
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 91
- Joined: Sun Jan 10, 2010 5:32 pm
- Location: Ashford, Kent
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
are you adding your 10% on materials then adding say 20% to the total as profit or ust taking the 10% on materials as your profit.
its getting hard up here with 3 quotes on jobs margins are getting to like 5% if that, i dont add anymore on materials just quote at retail and take the saving as part of the profit on them.
have you factored an extra day say contingency, bad weather, hit a drain right where you want the patio etc
what part the world you in? out local independent will deliver upto 4 loose a load on tipper. but all big nationals now no longer have the old aggregate bays all bagged up and delivered on wagons now.
saying that bags have their advantages, clean tidy easily re-handled and moved around.
Edited By GB_Groundworks on 1264024916
its getting hard up here with 3 quotes on jobs margins are getting to like 5% if that, i dont add anymore on materials just quote at retail and take the saving as part of the profit on them.
have you factored an extra day say contingency, bad weather, hit a drain right where you want the patio etc
what part the world you in? out local independent will deliver upto 4 loose a load on tipper. but all big nationals now no longer have the old aggregate bays all bagged up and delivered on wagons now.
saying that bags have their advantages, clean tidy easily re-handled and moved around.
Edited By GB_Groundworks on 1264024916
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 91
- Joined: Sun Jan 10, 2010 5:32 pm
- Location: Ashford, Kent
-
- Posts: 861
- Joined: Wed Feb 27, 2008 9:30 pm
- Location: SE London/ NW Kent
Have you tried these people.
http://www.jclubb.co.uk/
Not saying they will be cheaper (might be dearer!) but worth a call to see if your present supplier is competitive.
http://www.jclubb.co.uk/
Not saying they will be cheaper (might be dearer!) but worth a call to see if your present supplier is competitive.
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
you dont seem to have allowed any time to point the slabs will, 53m2 will need a dry 4-5 hrs for 1 bloke.
there will be people somewhere on your turf that deliver,although giles once you get sarf of the watford gap,we havent got any quarries
i would of thought you could get 10 tonne loose for around £250 tops
is there no digging out to do will?
will you need a skip for all the rubbish thats generated?
LLL
there will be people somewhere on your turf that deliver,although giles once you get sarf of the watford gap,we havent got any quarries
i would of thought you could get 10 tonne loose for around £250 tops
is there no digging out to do will?
will you need a skip for all the rubbish thats generated?
LLL
-
- Posts: 91
- Joined: Sun Jan 10, 2010 5:32 pm
- Location: Ashford, Kent
-
- Posts: 207
- Joined: Tue Aug 08, 2006 12:57 pm
- Location: Cape Town, South Africa
- Contact:
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
LLL IS THAT sand and cement pointing with trowel thats fast mmm ??? :;):lutonlagerlout wrote:you dont seem to have allowed any time to point the slabs will, 53m2 will need a dry 4-5 hrs for 1 bloke.
there will be people somewhere on your turf that deliver,although giles once you get sarf of the watford gap,we havent got any quarries
i would of thought you could get 10 tonne loose for around £250 tops
is there no digging out to do will?
will you need a skip for all the rubbish thats generated?
LLL
Originalstonepaving.com
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
The very best in natural stone paving in new and reclaimed materials
M: 07968 582231
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
600 by 600 slabs mr.cook :;):
lot less jointing than injun stone or setts
and i would be using a marshalltown jointing iron on concrete slabs rather than a trowel
but admittedly it would be more like a day for 1 experienced man
thing is if you have been on the knees for 5 hours the rest of the day is a bust
I did 68m2 of 450 by 450s last year on a very very long sunday, lets just say i wasnt doing a lot of dancing on the monday
LLL
lot less jointing than injun stone or setts
and i would be using a marshalltown jointing iron on concrete slabs rather than a trowel
but admittedly it would be more like a day for 1 experienced man
thing is if you have been on the knees for 5 hours the rest of the day is a bust
I did 68m2 of 450 by 450s last year on a very very long sunday, lets just say i wasnt doing a lot of dancing on the monday
LLL