Quick one for anyone with concrete experience. I have a laneway to build and was wondering if anyone has experience of using steel fibre or Dramix as a substitute for traditional mesh. I'm aware of the price difference but would like to hear others opinions especially if you were the one who paid for it. Is the extra money a good trade off for time and hassle saved. Does the fibre give the same strength as 10mm mesh etc. Thanks in advance.
Paul
Dramix
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
We only ever used steel fibre on a high-strength industrial floor that was to take a beast of a machine once the factory was finished. For pavement works, we only ever used polymer (polypropylene) fibres and found they were fine for most light traffic projects.
One of the regular jobs we had was building haul roads on landfill sites. One such site handled containerised waste, and the stacker truck used to manoeuvre the containers exerted a 42 tonne axle load. The handling section was cast with B-series mesh top and bottom of a 250mm slab, but all the other access roads, which would be carrying 50-80 bin wagons per day, plus a similar number of 6- or 8-wheelers, were constructed using 200mm thick fibre-reinforced slabs with regular movement joints (5m c/c, IIRC)
One of the regular jobs we had was building haul roads on landfill sites. One such site handled containerised waste, and the stacker truck used to manoeuvre the containers exerted a 42 tonne axle load. The handling section was cast with B-series mesh top and bottom of a 250mm slab, but all the other access roads, which would be carrying 50-80 bin wagons per day, plus a similar number of 6- or 8-wheelers, were constructed using 200mm thick fibre-reinforced slabs with regular movement joints (5m c/c, IIRC)
Site Agent - Pavingexpert
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
have used it on a lot of floor slabs. It is very strong and hard to break out. We use on a controlled pour involving thousands of metres non stop. Machine lays it lazer level controlled. The pins are mixed into the drum. I would say its as strong, if not stronger than mesh. Its so much quicker.
sean
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
Thanks fella's the lane will be occasional farm use like slurry tankers silage machines and cattle trucks there's also several houses. The stone has been in for years and is very tight was thinking 150mm c35/20 with 252 mesh. Will need approx 120 sheets of mesh but the fibre will cost £2500 more so I reckon I'll stick with mesh I don't think it's worth the money for stuff like this.
Can't see it from my house
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland