I have just started on my first journey into the world of the council building inspector!, it is just a small outbuilding conversion into an open shelter ,but as a landscaper I have never as yet built a wall any bigger than about 2 feet & in the past have just let the founds set for a few days before commencing.
so i just want to know how long should a concrete foundation be left to cure before embarking on *structural* brickwork basically 2 brick pillars 450 X225 X1.8 tied in on each side with wall starters.
cheers
Steve
Foundation curing
-
- Posts: 51
- Joined: Fri Oct 03, 2008 7:02 pm
- Location: carlisle, cumbria, england
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 51
- Joined: Fri Oct 03, 2008 7:02 pm
- Location: carlisle, cumbria, england
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire