Narrow access jobs

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 40954Post GB_Groundworks

mickg wrote:blimey GB in the good old days before mini diggers and tracked dumpers everything was dug by hard and moved in wheel barrows....

but hey thats when men were men and put a good hard days graft in :D
haha i know all about hand digging, put a 40 metre footing in the other week by hand in 3 days on my own as the laborer ducked after day 1 haha but there is a 200mm thick 3mx5m slab to come out and theres no way i'm breaking that up with a jack hammer get the krupp on the mini any day of the week.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Mikey_C
Posts: 952
Joined: Mon Oct 30, 2006 8:24 pm
Location: Bournemouth, Dorset

Post: # 40987Post Mikey_C

how are you going the ready mix in for the footing, pump? or are mixing it at the back of the site?

Post Reply