Looking to extend my existing driveway by tarmaccing the front garden. The quote I've received is for the following:
1. Take down a 2.2m length x 0.5m high front wall and dispose.
2. Lay 2.2m of front kerbing.
3. Excavate 22mm2 of garden to a max depth of 350mm and dispose.
4. Supply grade and compact Type 1 sub base.
5. Supply and lay 26m2 of tarmac, rolled 60mm thick.
6. Build a side wall consisting of 6m length foundation and block wall approx 600mm high with coping.
The quote for the above is £2400 + VAT and is based in Aberdeen.
I know nothing about tarmaccing prices but going to get a few more quotes to compare but this company comes reputable and I've heard there are plenty of cowboys out there.
Quote to tarmac drive - reasonable?
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Well cheap if that price includes ALL of that work.
The surfacing works is around £800-ish +VAT
The surfacing works is around £800-ish +VAT
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 193
- Joined: Mon Feb 16, 2009 10:25 pm
- Location: UK
hope the tarmac's to be laid in 2 layers - Binder Course & Surface Course, as if its 60mm of one layer you may have performance issues (rutting, fretting etc).
IMHO i'd say 60mm is a little on the lean side, as you'd normally expect 20mm Binder Course at least 50mm thick, with 25 - 30mm of 6 or 10mm Surface Course. i'd ask for a breakdown on the asphalt materials and also his recommended thickness of MOT.
IMHO i'd say 60mm is a little on the lean side, as you'd normally expect 20mm Binder Course at least 50mm thick, with 25 - 30mm of 6 or 10mm Surface Course. i'd ask for a breakdown on the asphalt materials and also his recommended thickness of MOT.
i used to love using tarmac, but got fed up with getting my asphalt
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
I missed that! Should be at least 75mm total construction - 50mm BC & 25mm 6mm SC for light vehicular traffic.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset