Suspected bad groundwork, need urgent advice pleas
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
Hi Dave, Firstly from the looks of that workmanship I would be looking to either pay them up and get rid of them or get them to make it good and refuse any payments until it is sorted.
1. Too many crosses and long joints and the joints are a bit wide.
2. Too many flags of the same size beside each other.
3. Flags should be laid with string lines and spirit levels. The variation in edge heights makes me wonder are they laying by eye although they could have sunk when walked on or because the mortar was saturated by washing etc. Have you walked on them when the mortar was still wet.
4. The flags that are too large should be cut to size before being laid and the cutting in should be done as you go too.
5.Check that the falls are good that bit by the fence looks like it's sloping towards the house although that may be intentional.
6.Get them to pull the weeds out by the fence before it's pointed and also clean thye old algae line on the wall.
1. Too many crosses and long joints and the joints are a bit wide.
2. Too many flags of the same size beside each other.
3. Flags should be laid with string lines and spirit levels. The variation in edge heights makes me wonder are they laying by eye although they could have sunk when walked on or because the mortar was saturated by washing etc. Have you walked on them when the mortar was still wet.
4. The flags that are too large should be cut to size before being laid and the cutting in should be done as you go too.
5.Check that the falls are good that bit by the fence looks like it's sloping towards the house although that may be intentional.
6.Get them to pull the weeds out by the fence before it's pointed and also clean thye old algae line on the wall.
Can't see it from my house
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
I'm with pablo on this one ,his comments are 100% correct,the slabs look badly stained with wet mortar,which will look very bed when dry,the pointing gap and depth is to small,looks like they were floating when laid as the mortar has pushed up the joints
the best answer is tell them to lift and start again doing it correctly and to a standard or lift it and leave the job alone,i would not pay them a penny for that standard,
it does not look good in the other pix far to much standing water,should have left the job till it stops raining and dries out
what was they going to point with?
hope iv not dishartend you to much,don't pay em a bean MSH
Edited By msh paving on 1245267214
the best answer is tell them to lift and start again doing it correctly and to a standard or lift it and leave the job alone,i would not pay them a penny for that standard,
it does not look good in the other pix far to much standing water,should have left the job till it stops raining and dries out
what was they going to point with?
hope iv not dishartend you to much,don't pay em a bean MSH
Edited By msh paving on 1245267214
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 34
- Joined: Tue Jun 16, 2009 6:05 pm
- Location: UK
Hi Pablo,
Thanks for the info
They didn't have a spirit level, I heard one of them say as much and they didn't use any string lines, just a trowel and a giant rubber mallet.
I've not been any closer than when I took the photos and certainly not walked on it, and neither has the dog, I've kept her well clear. I haven't washed them, and neither did they - the flags are still dull and full of cement.
They haven't done any cutting at all, in fact they didn't have any kind of cutter with them today, just the whacker and the cement mixer, I think that probably explains that. To my untrained eye, it looks like hes just made a pigs ear of the spacing and it's caught up with him and forced those two flags to touch?
I'm not sure what you mean by falls?
Also, I have paid them 1/3 of the total price, and I will not be paying them any more until it's done properly. I could get rid, but then I'm back in at the deep end, trying to find a trustworthy firm.
Thanks for the info
They didn't have a spirit level, I heard one of them say as much and they didn't use any string lines, just a trowel and a giant rubber mallet.
I've not been any closer than when I took the photos and certainly not walked on it, and neither has the dog, I've kept her well clear. I haven't washed them, and neither did they - the flags are still dull and full of cement.
They haven't done any cutting at all, in fact they didn't have any kind of cutter with them today, just the whacker and the cement mixer, I think that probably explains that. To my untrained eye, it looks like hes just made a pigs ear of the spacing and it's caught up with him and forced those two flags to touch?
I'm not sure what you mean by falls?
Also, I have paid them 1/3 of the total price, and I will not be paying them any more until it's done properly. I could get rid, but then I'm back in at the deep end, trying to find a trustworthy firm.
-
- Posts: 345
- Joined: Tue Aug 07, 2007 9:23 pm
- Location: Hereford
-
- Posts: 34
- Joined: Tue Jun 16, 2009 6:05 pm
- Location: UK
Hi mate,msh paving wrote:I'm with pablo on this one ,his comments are 100% correct,the slabs look badly stained with wet mortar,which will look very bed when dry,the pointing gap and depth is to small,looks like they were floating when laid as the mortar has pushed up the joints
the best answer is tell them to lift and start again doing it correctly and to a standard or lift it and leave the job alone,i would not pay them a penny for that standard,
it does not look good in the other pix far to much standing water,should have left the job till it stops raining and dries out
what was they going to point with?
hope iv not dishartend you to much,don't pay em a bean MSH
No, you've not disheartened me, I'm just really grateful for the advice because it's clear to me now that they are a bunch of cowboys.
I'm not sure what they point with, what is it a choice of?...no doubt they'll be using dairylea or similar
-
- Posts: 34
- Joined: Tue Jun 16, 2009 6:05 pm
- Location: UK
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
Why have you given them 1/3. Never pay a small job like that in stage payments,if the can't fund a job off that size they should not be in buisness ,full payment on compleation ,dont fall for the buying materials that why we all have accounts MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Posts: 345
- Joined: Tue Aug 07, 2007 9:23 pm
- Location: Hereford
-
- Posts: 34
- Joined: Tue Jun 16, 2009 6:05 pm
- Location: UK
Yes, it was for "materials".
To be honest, I asked all the people that I got quotes from and they all wanted a deposit like that for "materials" apart from one other ropey firm that insisted that i buy the materials from their supplier over the phone, needless to say I didn't do that, although now you've mentioned about the materials thing, I do feel a bit foolish.
To be honest, I asked all the people that I got quotes from and they all wanted a deposit like that for "materials" apart from one other ropey firm that insisted that i buy the materials from their supplier over the phone, needless to say I didn't do that, although now you've mentioned about the materials thing, I do feel a bit foolish.
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Posts: 166
- Joined: Sun Mar 16, 2008 6:01 pm
- Location: essex
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Posts: 348
- Joined: Sun Feb 24, 2008 8:34 pm
- Location: Widnes
- Contact:
Looking at the other pictures you have on photobucket I would insist he lifts them and start again. It looks to me like they havent a clue how to lay the stone to random. As has already been said there shouldnt be any crosses or long joints.
Also have they laid them using building sand and not grit sand?? To me it looks like brick laying mortar :rock:
Also have they laid them using building sand and not grit sand?? To me it looks like brick laying mortar :rock: