Suspected bad groundwork, need urgent advice pleas

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
Post Reply
davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38810Post davelad

Hi Folks,

I've got a local block paving/flagging firm here today and I'm not convinced that they are doing a proper job.

The deal was to remove the old concrete flags (which they have done), then to dig out the area, the boss said he'd dig out 100mm of whatever it is underneath and replace it with MOT and then add a 60mm layer of the sandy stuff on top (sorry, I forgot the name of it).

Anyway, it turns out that the old flags were laid on cinders, these cinders are at least 12" deep and are really soft like sand - that's why the old flags were moving around.

Anyway, I noticed that they had started to put the MOT down without digging any of the cinders out and I'm worried that I'll end up with a sagging patio and pathway.

They have whacker plated some of it, but I went and had a look and I was able to leave a footprint of about 1" deep in places and areas such as grids and edges are especially soft, so I'm guessing that's all wrong?

I asked them about it and got very vague answers, so I thought that you guys would be able to help me out? :)

The job consists of a garden path around 1.2m wide which runs from the garden gate, round the front and side of the house, finishing up with a patio. The path is going to be block paving and the patio is indian stone.

I can do photos of the current state of play if required.

Thanks in advance,

Dave.

henpecked
Posts: 1328
Joined: Thu Mar 26, 2009 9:00 am
Location: Warwickshire
Contact:

Post: # 38811Post henpecked

Bit of a grey area really. He will do whats agreed ,but it will leave your drive with pools and dips over time.
Im not sure how the other lads would deal with it, but it looks like your going to be paying out more if you want 300mm of cinders digging out and replacing with MOT.

HP

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 38812Post Dave_L

Have they supplied a written specification for the job?
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38813Post davelad

Thanks for the replies.

Yes, I'm not expecting the firm to go out of pocket, but then again, I don't want them to do less work than was agreed and still keep the same price.

I have a written estimate, but that didn't include the indian stone as originally it was going to be all blocks. It doesn't say what depth they would dig to on the estimate though, just "remove old flags and prepare ground ready for block paving"

davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38815Post davelad

Could I just ask, should I be able to put footprints into the MOT after it's been whackered? Some areas of it feel really hard and compressed and others just go to mush.

ambient
Posts: 393
Joined: Fri Jun 13, 2008 6:20 pm
Location: bolton lancs
Contact:

Post: # 38816Post ambient

no it sounds like it needed digging out before mot was put down looks like theyre cutting corners have you been to see any previous work of theirs
ambientdriveways.co.uk ambientexcavations-bolton.co.uk

davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38817Post davelad

OK thanks :)

davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38821Post davelad

Sorry, did you edit your post? it just said "no" earlier :)

Yes, i've seen a couple of their jobs and they've been fine, but I can't help worry about the soft ground. It's as if there's not enough stones in it?

Rich H
Posts: 884
Joined: Thu Feb 08, 2007 12:28 pm
Location: Reading

Post: # 38823Post Rich H

It doesn't matter what was agreed, I can't imagine putting MOT on top of loose cinders. Absolutely pointless.

Just done a job to re-lay crazy yorkstone paving which had moved a lot over 30 years. Spec'd 100mm sub as usual. When we lifted the old paving the slabs were laid on mortar straight onto the peat soil. Soft as sponge. We dug out an extra 12" before we hit firm sub grade.

The point is that I would no sooner have put MOT on top of an unstable sub grade than I would fly to the moon. We agreed the remedy (extra coarse hardcore then extra MOT, wackered in 100mm layers) and the cost involved before cracking on.

My advice would be that if they're not willing to dig out the cinders and re-instate (at an agreed price of course) then pay them for what they've done and get them off the job.

davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38832Post davelad

Had it out with the boss this morning, he agrees that some of it isn't up to scratch and is going to dig out the front part.

I showed him the back area where I was able to leave half inch footprints in parts of it and he said he's ordered another ton of MOT and they'll whacker that down and it should be ok. He also went on to say that because the back area is having Indian stone on it, the preparation is different somehow and that once the cement has set, it's not going to move.

Not sure what to make of that really.

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 38833Post DNgroundworks

Me neither!

Prepartion is no different, Indian stone still needs sufficient subbase.

It may not move initialy but after a while pointing will crack and everything will start to settle.

Rich H
Posts: 884
Joined: Thu Feb 08, 2007 12:28 pm
Location: Reading

Post: # 38834Post Rich H

Extra MOT is unlikely to help. The sub-grade needs to be firm in the first place. You can use a suitable geo-textile membrane under the MOT if there is the odd suspect spot but not with larger areas.

As DNG says, preparation is no different. If the sub-base has movement just from your own body weight, the paving WILL fail.

davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38835Post davelad

Thanks chaps,

Just had another word, he says that they wont lay any of the blocks/flags until I'm happy with the groundwork.

It's actually bucketing it down at the moment so that's stopped the job for now.

I'll update later if there's any developments.

Cheers.

Rich H
Posts: 884
Joined: Thu Feb 08, 2007 12:28 pm
Location: Reading

Post: # 38844Post Rich H

That's the sort of response you want. Shame you had to push it so far before he said the right thing.

davelad
Posts: 34
Joined: Tue Jun 16, 2009 6:05 pm
Location: UK

Post: # 38853Post davelad

Yes, unfortunately, he was lying to me. They just went ahead and did it, but in the parts I can see, it is now quite hard, even though its all waterlogged.

Some of the flags are very uneven - I realise there's going to be natural variation in the stone, but this doesn't look right to me.

Image

The large flag, bottom right has sunk about 1-2 cm and you can see that two of the flags are touching so they won't be able to add pointing there - is that normal practice?

Image

Image

A few more of the pics from the job can be found here.