Hi,
Does anybody know what the standard distance is for underground foul water rising mains in relation to clean water pipes and other services?
(A diagram of some sort would be very helpful!)
Thanks
Underground pipe spacing - Sewer rising main
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
a foul water rising main is a pumped sewerage pipe from a pumping station to the sewage works ,they will run in roads and possibly cross fields and have no interest to a home owner
as far as I'm aware there is no regulation distance required MSH
as far as I'm aware there is no regulation distance required MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
It is all depending on existing services, where you are pumping from and to where. obviously if you are below existing services contamination is less of an issue. specialist fittings and pipe work are needed ie hpde, tyton, timesaver, viking jonson fittings, air valves etc. gradient is not a problem as it is pumped from pumping station to outlet. a minimum of 100 dia pipe is required.
sean
-
- Posts: 207
- Joined: Tue Aug 08, 2006 12:57 pm
- Location: Cape Town, South Africa
- Contact:
Guessing that this is a contractual application, you should have a standard supplied by who-ever placed the order. Having said that, generally the minimum spacing between runs of pipes would be 1.5 x the largest dia, but remember that you need to allow spacing for flanges and supports, access etc. PVC and HDPE piping have their own specs, having to be supported more often. From what I can rememember minimum depths allowed is 650mm to top of pipe running horizontally with warning tape 150mm above that. These are just general guidelines, either get your hands on a engineering handbook or check with the project managers - they should have all these details on data sheets.
W.G.Carter-Smith
http//:victoriancobbles.co.za