i'm just putting in the sub base for a path(40mm crusher run) at about 150mm deep.
how much do you think it will compact down when whacked? i want the finished path to come out at the same height as a concrete step which will be paved too but obviously wont move
thanks
Kev
Compacting the sub base - How low will it go?
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
depends on the compaction equipment being used and the quality of the crusher run, if its got enough fines in it and whether it is really 40mm and not half bricks haha
if you start 20mm above your step you should be ok assuming a lightish plate compactor.
if you start 20mm above your step you should be ok assuming a lightish plate compactor.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com