Hi
We have recently built an extension - roughly 9.5 m2.
I managed the project myself and was advised to run the rainwater from the newbuild to a new soakaway.
I have dug a hole just over 5m from the building. It is 1m x 1m x 1.2m deep. I think I have just got through the layer of clay at the bottom - it is a bit more stoney etc.
Firstly is this fit for the purpose. Secondly what pipes should i use to run underground from the guttering downpipes to the soakaway - should they be perforated...how deep should they be etc. I have had conflicting advise from various people and the building inspector could not offer specific advise until he had seen the soil conditions etc - i don't really want to have to call him out until I have everything in position so he can sign it off there and then.
Grateful if you can offer any advise.
We have recently built an extension - roughly 9.5 m2.
I managed the project myself and was advised to run the rainwater from the newbuild to a new soakaway.
I have dug a hole just over 5m from the building. It is 1m x 1m x 1.2m deep. I think I have just got through the layer of clay at the bottom - it is a bit more stoney etc.
Firstly is this fit for the purpose. Secondly what pipes should i use to run underground from the guttering downpipes to the soakaway - should they be perforated...how deep should they be etc. I have had conflicting advise from various people and the building inspector could not offer specific advise until he had seen the soil conditions etc - i don't really want to have to call him out until I have everything in position so he can sign it off there and then.
Grateful if you can offer any advise.
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
read http://www.pavingexpert.com/drain08.html
you'll need to do a soil porosity test to see if a soakaway will work, plus calculate the size required from the roof area you will be draining.
you'll need to do a soil porosity test to see if a soakaway will work, plus calculate the size required from the roof area you will be draining.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 3
- Joined: Sun Mar 15, 2009 7:51 pm
- Location: Bedford
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
BC will be happy as long as your 110mm upvc pipe has a 1: 40 fall from the guttering to the soakaway this equates to about 125 m of fall, the soakaway needs too have at least 225mm of topsoil on top of it on top of 1200 gauge visqueen,covering the hardcore (still told to use hardcore in luton?) its worth using a roddable back inlet gulley at the gutter end so your pipe does not become full of leaves and deitrius
LLL
LLL
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
I've been writing a guide to carrying out porosity tests, but to summarise the main points:
Hole, 300x300x300 must be at least 500mm below invert level
Fill with water, let it drain to empty. Re-fill and record how long it takes to drain to empty again.
If poss, repeat at least three times to get an average figure
Hole, 300x300x300 must be at least 500mm below invert level
Fill with water, let it drain to empty. Re-fill and record how long it takes to drain to empty again.
If poss, repeat at least three times to get an average figure
Site Agent - Pavingexpert
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
There is "official" guidance on soakaway construction (BRE Digest 365) but it's not the easiest thing to follow, and so most BCOs rely on what they know: a hole filled with owld bricks.
This narticle that I'm writing is an attempt to humanise BRE365, but it's bloody hard going, and I'm not sure it's pertinent to a typical driveway/patio application. It's definitely *the* way to go for larger site-sized installations, but in my experience, the soil tests for those jobs is done by geo-technical boffins, whereas I'm looking to create something that can be used by smaller contractors and keen DIYers working on a <100m² project.
This narticle that I'm writing is an attempt to humanise BRE365, but it's bloody hard going, and I'm not sure it's pertinent to a typical driveway/patio application. It's definitely *the* way to go for larger site-sized installations, but in my experience, the soil tests for those jobs is done by geo-technical boffins, whereas I'm looking to create something that can be used by smaller contractors and keen DIYers working on a <100m² project.
Site Agent - Pavingexpert
-
- Posts: 3
- Joined: Sun Mar 15, 2009 7:51 pm
- Location: Bedford