Clay  foul sewer under drive. - Depth of cover over a clay pipe under a

Foul and surface water, private drains and public sewers, land drains and soakaways, filter drains and any other ways of getting rid of water.
Post Reply
ger
Posts: 3
Joined: Sun Feb 22, 2009 7:37 pm
Location: Nr wigan, Lancashire.

Post: # 34817Post ger

My drive currently consists of concrete slabs 900x600 and probably was laid when the house was built in 1964 [the slabs are well weathered]. There is a slope in the drive up from the pavement [700mm over 6 meters]. There is a main clay foul sewer pipe which runs across under the drive and garden, this pipe serves my house and other houses as it goes under their gardens and drives.
I now want to block pave the drive and some of the garden to take two cars side by side. I would like to flatten the slope as much as possible which would involve digging out the area where the pipe runs under. The pipe is approximately 400mm under the drive [top of concrete slab to top of clay pipe 400mm].
The question is how much can i reduce the cover over the pipe or is the 400m the limit. Perhaps some form of concrete cover to protect the pipe any suggestions. Ger.
Ger

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 34822Post GB_Groundworks

to handle the weight i'd be tempted to encase the whole pipe in concrete, not just on the top but at the sides and bottom as well to pass the load around the pipe not onto it. i'd also protect the pipe aswell before concrete with some kingspan or the like.

flowjoe will be able to tell you the exact cover required.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 34823Post lutonlagerlout

the pipe should be concreted in already,but if you expose it and encase with 100mm of concrete all round ,then lay your 125mm of type 1 over that you should be ok,dont forget the pipe will be falling so may be higher at one end
cheers LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 34825Post GB_Groundworks

as a side note heard of another groundworker round here who on pouring a footing for a conservatory shot the concrete straight out the wagon onto a 4 inch clay pipe, broke the pipe and put almost 2 cube down the sewer. they left it and was a road up job etc got right into the main sewer expensive fix.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 34828Post Dave_L

Holy crap! That doesn't even bear thinking about.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 34836Post seanandruby

should be 100/150 ml concrete cover all round at that depth, also fibreboard movement joints at every coller.
sean

ger
Posts: 3
Joined: Sun Feb 22, 2009 7:37 pm
Location: Nr wigan, Lancashire.

Post: # 34849Post ger

Many thanks for all the replies. I shall check to see if the pipe has some concrete around it and take it from there. Ger
Ger

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 34893Post Tony McC

This is what you need.
Site Agent - Pavingexpert

ger
Posts: 3
Joined: Sun Feb 22, 2009 7:37 pm
Location: Nr wigan, Lancashire.

Post: # 34901Post ger

Thanks that explains everything. Ger.