Running new foul water drain - Access to main sewer

Foul and surface water, private drains and public sewers, land drains and soakaways, filter drains and any other ways of getting rid of water.
Post Reply
alcad
Posts: 4
Joined: Wed Feb 04, 2009 4:26 pm
Location: United Kingdom

Post: # 34431Post alcad

I have recently had my property connected to the main sewer
The contractor piced up all the existing house connections and ran a 110mm plastic drain to the sewer in the road. Access points were installed at every connection and change of direction, but no manhole/access poit was installed at the property boundary prior to connecting to the sewer. The total distance from the last access point to the sewer is approx 22m. I now find that some three weeks after completing the work that all access/manholes are full which tends to suggest that the final run is blocked. Can you advice me if there should be a access/manhole at the boundary, prior to the sewer

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34432Post msh paving

the first thing to look is see if they removed any bung in the conection in the road,if its a vacume system has the pot been powered on? why 150mm in a house connection?,second did building control check the fall and to a water test on it? if not why not then get the contractor back to fix it unless it is blocked with something call a jetting company out then go from there, you need a manhole max distance 40m its advisable to have one at end of property but again building control will advise on that depending if you connect into a manhole in road if so there is little point,if going into a junction a manhole is needed
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

flowjoe
Posts: 1136
Joined: Sun May 08, 2005 9:25 am
Location: North West

Post: # 34435Post flowjoe

I am pretty sure if its a new sewer connection you have to have a manhole within 15mtrs of it, manholes on the boundary are always a good idea but sadly not enforced by building control.
http://draindomain.com

Many paths can lead to riches, few in sunlight, some in ditches

alcad
Posts: 4
Joined: Wed Feb 04, 2009 4:26 pm
Location: United Kingdom

Post: # 34436Post alcad

msh paving wrote:the first thing to look is see if they removed any bung in the conection in the road,if its a vacume system has the pot been powered on? why 150mm in a house connection?,second did building control check the fall and to a water test on it? if not why not then get the contractor back to fix it unless it is blocked with something call a jetting company out then go from there, you need a manhole max distance 40m its advisable to have one at end of property but again building control will advise on that depending if you connect into a manhole in road if so there is little point,if going into a junction a manhole is needed
Thanks , My mistake, the pipe size is 110mm.
The installation was checked and passed by the local building control officer, so I am assuming that all the necessary tests, and inspections were carried out
I'll get a drain company in as you suggest, in the hope that they can clear the problem. but was wondering whether I should have a manhole at the boundary, as it would make rodding easier in the event of any future problems

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34437Post msh paving

as i said depends if there is manhole in road close to property,last m/h 22m away one at boundry would be nice but how deep are you at that point? a plastic m/h could be put in but if you have to goto precast concrete rings you can soon spend 500quid, what part of country are you :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 34438Post Dave_L

Suggest you get the contractor back.

Were they allowed to connect to the main sewer run themselves??
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

alcad
Posts: 4
Joined: Wed Feb 04, 2009 4:26 pm
Location: United Kingdom

Post: # 34439Post alcad

msh paving wrote:as i said depends if there is manhole in road close to property,last m/h 22m away one at boundry would be nice but how deep are you at that point? a plastic m/h could be put in but if you have to goto precast concrete rings you can soon spend 500quid, what part of country are you :)
I dont know how deep it is at the boundary, will have to check with the contractor, butI think I'll get the drain cleaners in first, then discuss with the BCO, and contractor on the merrits,and cost of fitting an extra manhole at the boundary

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 34445Post seanandruby

did he actually connect to a manhole, or put in a new manhole in the road?
i am hoping he did'nt just use a saddle ???
have you looked in the existing manhole to make sure its isnt bunged? also have you tried rodding it?
sean

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 34447Post Dave_L

I wouldn't get anybody but the original contractor involved at this stage - unless he can prove it is blocked with an item of your making, the problem rests with him, in my opinion. How long has this connection been in place?

Rodding it would be the first thing you could do at low or no cost, that would give you then an idea of where the obstruction might lie.

Surely the type of connection would have been approved/inspected by the relevant utility operator and the seal of approval given? That is what happens when we do one.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

alcad
Posts: 4
Joined: Wed Feb 04, 2009 4:26 pm
Location: United Kingdom

Post: # 34461Post alcad

I would like to thank everyone for your advice. I couldnt rod it as the length of run from the last access manhole to the sewer is greater than the length of my rods. A drainage company arrived this morning , and freed the blockage with his pressure hose. I have also arranged to meet the contractor who installed the drain,and BCO, in order to discus the possible need for installing an extra manhole nearer to the boundary
Once again, thanks for all your advice
AL

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 34464Post msh paving

glad we was help to you,nice to see a simple end to a problem :)