Quote from marshalls

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
gavinruane
Posts: 29
Joined: Mon Apr 21, 2008 4:28 pm
Location: south east and london
Contact:

Post: # 33274Post gavinruane

i have a job to do which is a new build and has downpipes connected to 3 or 4 soakaways....can i tap into those soakaways with drainage pipes from my newly laid aco channels?
patios,paths,driveways and full garden makeovers in the london and south east areas as well as resin bound installations

gavinruane
Posts: 29
Joined: Mon Apr 21, 2008 4:28 pm
Location: south east and london
Contact:

Post: # 33275Post gavinruane

i have a job to do which is a new build and has downpipes connected to 3 or 4 soakaways....can i tap into those soakaways with drainage pipes from my newly laid aco channels?
patios,paths,driveways and full garden makeovers in the london and south east areas as well as resin bound installations

gavinruane
Posts: 29
Joined: Mon Apr 21, 2008 4:28 pm
Location: south east and london
Contact:

Post: # 33276Post gavinruane

sorry guys i am not sure if this question has gone thru already,but excuse my repetitveness if it has....If a new build has the downpipes already connected to a number of soakaways and the owner gives me permission to connect my aco channels to them...is this within the law?
patios,paths,driveways and full garden makeovers in the london and south east areas as well as resin bound installations

williams
Posts: 166
Joined: Sun Mar 16, 2008 6:01 pm
Location: essex

Post: # 33281Post williams

gavinruane wrote:sorry guys i am not sure if this question has gone thru already,but excuse my repetitveness if it has....If a new build has the downpipes already connected to a number of soakaways and the owner gives me permission to connect my aco channels to them...is this within the law?
yes

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 33299Post Tony McC

There's no problem draining to an existing soakaway (or other suds installation), assuming that the soakaway is capable of dealing with the additional input.

Most new build soakaways are genuine soakaways rather than rubble-filled holes, and tend to have a significant over-capacity, so unless you were draining, say, more than 100m² of hard paving, it shouldn't be a problem. If you have any concerns, see if you can find out the size of the soakaway and the ground permeability, which would allow you to determine whether or not it was suiitable for additional work.
Site Agent - Pavingexpert

Post Reply