Segmental arch
-
- Posts: 12
- Joined: Mon Nov 03, 2008 4:03 pm
- Location: west midlands
hello this is kes
can anyone tell me how to find the striking point of a segmental brickwork arch that is so close to the ground or so wide that the originating point is actually below ground, so i am unable to use a taught line to accurately lay the bricks to get consistent joints ???
can anyone tell me how to find the striking point of a segmental brickwork arch that is so close to the ground or so wide that the originating point is actually below ground, so i am unable to use a taught line to accurately lay the bricks to get consistent joints ???
AINT YOU FINISHED THAT YET!!!
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
http://www.diyinfo.org/images/a/a6/Brickarch_D.jpgTony McC wrote:By "striking point", does this mean the origin, ie, the point from which the arc is swung? I'm not overly familiar how the terms used by brickies compare to those used in the civils trade.
Tony i think this is a link to what you asked for.
sean
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 12
- Joined: Mon Nov 03, 2008 4:03 pm
- Location: west midlands
THANKS FOR YOUR RESPONSES TO MY QUESTION ABOUT SEGMENTAL ARCHES, BUT I'M STILL UNABLE TO ACCURATELY LAY THE BRICKS SO THEY ARE RADIATING TRULY FROM THE STRIKING POINT AS IN SEANANDRUBY'S EXAMPLE OF A SEMI CIRCULAR ARCH, BECAUSE THE STRIKING POINT OF A SEGMENTAL ARCH IS LOWER BEING ONLY PART OF A BIGGER ARCH. I HAVE SET THE BRICKS OUT ON THE DECK LIKE LUTONLAGERLOUT SAID SO THE ARCH FITS CORRECTLY INTO THE OPENING BUT I STILL CAN T ACTUALLY USE THE STRIKING POINT TO PRECISELY RADIATE THE BRICKS AS THE STRIKING POINT ORIGINATES BELOW GROUND. AM I MISSING SOMETHING OBVIOUS HERE? ???
AINT YOU FINISHED THAT YET!!!
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 335
- Joined: Mon Aug 11, 2003 4:24 pm
- Location: Derbyshire
- Contact:
-
- Posts: 335
- Joined: Mon Aug 11, 2003 4:24 pm
- Location: Derbyshire
- Contact:
The wide joints are unsightly, though in theory the bricks can touch at the inner end. The only alternative is to use rubbed voissoirs - but that's a lot of work if you rub them down yourself (there's a joke in there somewhere).Tony McC wrote:Thanks Sean
Not so keen on those wide joints, though!
John
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
when i was a lad the guy that taught me to lay bricks said when he did his time he spent weeks rubbing down voissoirs (pre grinder days dont forget) that is why a lot of arches are built in soft Leicester reds
i dont understand your problem kes?
if you have the width of the arch and the rise then it can all be drawn on a piece of paper using a ruler and compass,then scaled up and marked out on 2 sheets of play,that are then cut with a jig saw and fixed together at the required wall width
the arch former is then propped up (remember a 10 mm wedge so you can get the poxy thing out without knocking the arch down)
is this what you are trying to do?
cheers LLL
Edited By lutonlagerlout on 1226597228
i dont understand your problem kes?
if you have the width of the arch and the rise then it can all be drawn on a piece of paper using a ruler and compass,then scaled up and marked out on 2 sheets of play,that are then cut with a jig saw and fixed together at the required wall width
the arch former is then propped up (remember a 10 mm wedge so you can get the poxy thing out without knocking the arch down)
is this what you are trying to do?
cheers LLL
Edited By lutonlagerlout on 1226597228
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 12
- Joined: Mon Nov 03, 2008 4:03 pm
- Location: west midlands
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
no mate the play template goes under the arch,so if you have a 225 wide arch you would make your template at 200 mm say spacing the 2 arcs of play with 3 by 2 or such
you then build your bricks on top of this ,cutting where necessary and let it go off for 3-4 hours at least (a day is best) before striking the arch former
i get a chipie to knock me formers up he charges about £70
i did have about 20 in the garage but i ended up chucking them as they very rarely get used twice IME
cheers LLL
you then build your bricks on top of this ,cutting where necessary and let it go off for 3-4 hours at least (a day is best) before striking the arch former
i get a chipie to knock me formers up he charges about £70
i did have about 20 in the garage but i ended up chucking them as they very rarely get used twice IME
cheers LLL
-
- Posts: 11
- Joined: Wed Nov 26, 2008 4:13 pm
- Location: Eire
Hi Kes
A handy way is to place the template on a flat surface and set out the bricks dry around the circumference of the arch.
Cut or adjust the bricks where necessary and then mark the joints on the template.
Only a matter of then setting ur template in position and build to the marks. I find this way is a lot handier and gives good results. Also no need to use a string from the striking point.
Tomas.
A handy way is to place the template on a flat surface and set out the bricks dry around the circumference of the arch.
Cut or adjust the bricks where necessary and then mark the joints on the template.
Only a matter of then setting ur template in position and build to the marks. I find this way is a lot handier and gives good results. Also no need to use a string from the striking point.
Tomas.