Sub base - Wet sub base
-
- Posts: 1
- Joined: Wed Sep 03, 2008 9:43 am
- Location: barnard castle
HI, I am a new member and need a little advice.Yesterday i hired a mini digger and motorised barrow and dug out a soil area of about 35 square metres.I then put in 75mm of inch down dolomite in,i was just about to wack it and then................. rain ....rain.... rain......It got soaked to the point that your feet sink straight in.I have not wacked it all, do i just have to wait until it dries out or is their any other method to get the work completed.