i am starting a 9m sq patio with crazy-paving red/orange jerusalem limestone. the pieces range from 10x10cm to 1/2m sq. thickness varies from 2-5 cm
i read in the main webpage that placing them on a 1:10 cement to sand base is best
my question is: how much water should one put onto this cementitious base before setting the stones? in particular given this cement-sand base is 50mm thick?
simon
Crazy paving - And 1:10 cement(itious) base
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
I have a sneaking feeling that the Jerusalem limestone is one of those tricksy blighters that needs to be handled with kid gloves to avoid wicking cement to the surface. I know there's a very similar limestone that hails from Crete/Cyprus (can't recall which) that needs to be laid on a white cement mortar and slurry sealed on the underside prior to laying, otherwise it is ridiculously prone to picture framing and bed staining. At only 10-20mm thickness, this paving of yours would have me worried.
In view of the above, I'd probably use a pre-placed concrete slab, 75mm thick, and then use either a thin-set mortar or an SBR-enhanced mortar to fix the pieces in place, once they been sealed using a cement/SBR or cement/PVA slurry on the base. If I had to lay them directly onto a laying course, I'd use 50-75mm of the aforementioned SBR mortar, but would be wary of just how damned fast that stuff will go off, especially at this time of year.
In view of the above, I'd probably use a pre-placed concrete slab, 75mm thick, and then use either a thin-set mortar or an SBR-enhanced mortar to fix the pieces in place, once they been sealed using a cement/SBR or cement/PVA slurry on the base. If I had to lay them directly onto a laying course, I'd use 50-75mm of the aforementioned SBR mortar, but would be wary of just how damned fast that stuff will go off, especially at this time of year.
Site Agent - Pavingexpert
-
- Posts: 2
- Joined: Fri Jul 25, 2008 6:16 am
- Location: Israel
thnak you - in fact the stone is 20-50mm thick - when you mention mortar/svp slurry does this mean that the stones are laid onto a wet mixture - that is, the 1:10 cement:sand plus SVP base for the stones should be quite wet
simon
simon
amateur builder - love projects that challenge - great break and relief from work - would love one day to build own cabin-house from stone