Can anyone advise me on the best method of rolling a driveway we are constructing, it is 100 metres long we have put down 75mm hard lime stone (crush and run I think they call it) I have hired a 2.5 ton ride on twin drum roller but I am unsure as to the best rolling method or pattern to use or number of passes over the drive.
Is it best to run up and down the length of the drive or just random?
Any advise please
Method of rolling hardcore - Using a ride on roller
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Overlapping runs, using the vibration.
No hard and fast rules to the amount of passes etc, you just need to watch the material - see when it doesn't compact any more - technical eh??
Remember to disengage the vibrator in advance of stopping or changing direction, otheriwse you'll end up with more waves in your material than the sea!
No hard and fast rules to the amount of passes etc, you just need to watch the material - see when it doesn't compact any more - technical eh??
Remember to disengage the vibrator in advance of stopping or changing direction, otheriwse you'll end up with more waves in your material than the sea!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
ooops missed that!Pablo wrote:75mm of stone sounds a bit thin for a driveway
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page