where do you get 1.5 m3 from?
the dimensions you gave us you need .5m3 tops =1 tonne of ballast plus 5 bags OPC
LLL
Calculating materials needed for wall footing.
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
cool estimating materials correctly is important,my blokes just screeded a floor of 65m2, at 90 mm thick i estimated this to be 12 tonnes of grit sand and 60 opc. we had about 1.5 tonnes left over and 7 bags of dust
another builder wanted the guy to get 30 m3 of readymix screed delivered,thats over 60 tonne
can you imagine how bad that would have gone?
LLL
another builder wanted the guy to get 30 m3 of readymix screed delivered,thats over 60 tonne
can you imagine how bad that would have gone?
LLL
-
- Posts: 884
- Joined: Thu Feb 08, 2007 12:28 pm
- Location: Reading
-
- Posts: 952
- Joined: Mon Oct 30, 2006 8:24 pm
- Location: Bournemouth, Dorset