Storm water attenuation cell installation - Wavin aquacell system installation pics

Foul and surface water, private drains and public sewers, land drains and soakaways, filter drains and any other ways of getting rid of water.
Post Reply
Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 27582Post Dave_L

Due to the local authority not allowing connection to the 300mm SW pipe that runs across the site, the project had to look for another SW solution.

There is a large ditch running along the lower end of the site, which we were allowed to send the water into.

But the large deluge of water from the building and associated car park/footpath/play areas is to be controlled, a SW attenuation system was specified. This is basically a tank constructed from many 'crates' interlocked together which is then sealed by a bespoke welded heavy plastic envelope, which is sealed with 100mm wide tanking tape. The outfall of the tank then exits into a chamber which contains a hydro-brake, which regulates the outflow of the cell to the ditch.

Wavin Aquacell

Typical hydro-brake device, I didn't get pics of it as it was going in - too busy!

Image

Area excavated to formation level.....100mm of non-angular chipping laid in bottom of excavation then 100mm of sand to provide a level base for the unit. This is essential, we found. It is essential not to over-dig the excavation, as you will just consume more selected fill material than is necessary.

Image

Top chamber installed - SW connection from car park comes in from the left, roof and play area SW comes in from the bottom of picture. Proposed outfall from system discharges into ditch behind machine, behind hedge.

Image

Close-up of top chamber before cell showing incoming SW pipework, prior to backfill etc

Image

Excavation almost complete. Blue cells can be seen in the background - that's a whole artic-load. Ground conditions - clay - soakaway unsuitable.

Image

Welded liner fitted and orientated correctly, get it right first time as it isn't easy to reposition!
Installation of crates begins......clipped together by some very well designed clips, worked a treat. We had this installed in 3hrs - 3 men.

Image

All crates installed bar the last 6 - six short!! All that remains is to neatly fold the liner in over the cell and seal down all edges. Install a vent on top of the chamber to protrude above finished ground level.

Image

Backfilling - a protective membrane sheet is placed between the liner and the non-angular 100mm stone fill around the sides of the cell - the top was then sanded 150mm and then 500mm (min) cover over the top, back to finished ground level.

Hopefully I'll have my camera handy when we go back to do the final drain test.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

flowjoe
Posts: 1136
Joined: Sun May 08, 2005 9:25 am
Location: North West

Post: # 27584Post flowjoe

Nice job Dave.

I may PM you for some pics for a website i am working on if thats OK, what price per unit did you pay for the crates ?
http://draindomain.com

Many paths can lead to riches, few in sunlight, some in ditches

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 27586Post Dave_L

We didn't buy the crates, but looking on Wavins site the RRP is £81-something each!!!!!!!

Yes, £81 each......... :cool:




Edited By Dave_L on 1209297842
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 27588Post lutonlagerlout

those crates are daylight robbery,i'm sure tony mentioned a while back that they would be getting cheaper,we pay about £55 +vat for the blues and £37+vat for the greens
adds a lot of cost to a soakaway
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 27590Post Dave_L

Well we used 306 crates in that cell......sheesh.....
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 27591Post Dave_L

flowjoe wrote:I may PM you for some pics for a website i am working on if thats OK
Yes, no problem - will get some more of the finished article ASAP.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

matt h
Posts: 607
Joined: Mon Jul 09, 2007 11:14 pm
Location: gosport

Post: # 27603Post matt h

nice project. awful lot of sand over top though how is it retained? sorry to hear the price of them crates.. well the price of progress i suppose:(
general builder, maintenance engineer, gas and plumbing installations, extensions etc

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 27610Post Dave_L

matt h wrote:nice project. awful lot of sand over top though how is it retained?
150mm sand then 500mm soil on top to finished level, not all sand, mind.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page