Hi I am having my block paving done about 60sq mtrs. I thought type 1 scalpings were laid below the sand screed but the guys doing have dug it out and say the best way to go is with a 5" ballest and cement dry mix which will be wackered down to give me a solid base, before they put on a sand screed.
My concerns are will this be as solid a base as type 1 and although the drive does have a good slope on it will the water drain as well.
Are they doing this to save money as will the cost of type 1 scalpings be more than cement and ballest..
Please Help..
Cement ballest sub base?? - Please need advice
-
- Posts: 11
- Joined: Thu Jan 08, 2004 10:41 am
- Location: north lincs
- Contact:
-
- Posts: 2
- Joined: Tue Jan 15, 2008 10:21 am
- Location: hants
-
- Posts: 127
- Joined: Mon Nov 05, 2007 5:37 pm
- Location: Surrey
- Contact:
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
Using a hydraulically bound sub-base is done in an attempt to minimise settlement. However, if the contractors were to spend more time installing a proper flexible sub-base, and pay more attention to their screeding, edge course construction and cutting-in, there'd be a lot fewer instances of settlement.
I'm becoming increasingly concerned that bound sub-bases are being used by some so-called contractors in place of thorough construction and best practice. There are instances when a bound sub-base is justified, but these are the exception, not the rule.
If a bound sub-base is used, there are problems regarding drainage of the laying course, as discussed on this page
I'm becoming increasingly concerned that bound sub-bases are being used by some so-called contractors in place of thorough construction and best practice. There are instances when a bound sub-base is justified, but these are the exception, not the rule.
If a bound sub-base is used, there are problems regarding drainage of the laying course, as discussed on this page
Site Agent - Pavingexpert