Laying next to an existing patio
-
- Posts: 2
- Joined: Sat Dec 08, 2007 2:23 pm
- Location: Derbyshire
Hi
I need to extend a patio, however I'm worried that when I dig out the existing patio will sink! The current patio is layed on sand over a heavy clay subgrade material. Its a light to medium use patio so was intending on laying it on 40mm of 8:1 semi wet mix of cement.
My questions are:
Will the existing patio sink and if so is there anything I can to prevent this?
Is the base thick enough? (note that I'd rather not lay an MOT sub base due to cost)
Slabs to be used are 60mm X 600mm x 20mm
Cheers
I need to extend a patio, however I'm worried that when I dig out the existing patio will sink! The current patio is layed on sand over a heavy clay subgrade material. Its a light to medium use patio so was intending on laying it on 40mm of 8:1 semi wet mix of cement.
My questions are:
Will the existing patio sink and if so is there anything I can to prevent this?
Is the base thick enough? (note that I'd rather not lay an MOT sub base due to cost)
Slabs to be used are 60mm X 600mm x 20mm
Cheers
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
Is the base thick enough? (note that I'd rather not lay an MOT sub base due to cost)
do this at your peril. your new patio will sink if you don't use a sub base, as will the old one given time. a disaster waiting to happen
You don't need mot type one. use crushed concrete, its recycled and cheaper.
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
If the existing patio has not sunk to date, what makes you think it will do so when you excavate for the extension? Are you concerned that some of the bedding will wash out or trickle away? If so, then accept that this nearly always happens and the usual "fix" is to let it, and then when you come to lay the new paving, you lift the sunken/dropped paving at the edge of the excavation and re-lay that while you're at it.
Site Agent - Pavingexpert
-
- Posts: 2
- Joined: Sat Dec 08, 2007 2:23 pm
- Location: Derbyshire
Hi Tony thanks for the info that answers my question. Yes I was worried that in the process of digging out some of the sand would fall away.
With reference to the base, is there any way of getting round laying a sub base i.e. by increasing the thickness of the concrete being laid, if so what sort of depth would be suitable? I don't own a wacker plate but do own a cement mixer so it would be a lot cheaper to order an extra ton of sand than it would be to hire a wacker and a ton of mot/hardcore.
With reference to the base, is there any way of getting round laying a sub base i.e. by increasing the thickness of the concrete being laid, if so what sort of depth would be suitable? I don't own a wacker plate but do own a cement mixer so it would be a lot cheaper to order an extra ton of sand than it would be to hire a wacker and a ton of mot/hardcore.
-
- Posts: 607
- Joined: Mon Jul 09, 2007 11:14 pm
- Location: gosport
-
- Posts: 637
- Joined: Sat Mar 18, 2006 7:35 pm
- Location: Edinburgh
A days hire of a wacker and a ton of crushed concrete isnt going to break the bank to be fair. It will be more expensive to rectify when it all sinks and you get trips all over the place.
It doesnt matter how much use a patio gets really, if the subgrade is going to settle, it will do it in its own time, extra weight only accelerates the settlement.
It doesnt matter how much use a patio gets really, if the subgrade is going to settle, it will do it in its own time, extra weight only accelerates the settlement.
-
- Posts: 24
- Joined: Thu Dec 06, 2007 8:39 pm
- Location: Cottesmore, Rutland, UK .
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
My own opinion is that a sub-base is NOT always necessary with a patio. I accept that it's often a better construction when a sub-base is used, but some patios/pathways just don't warrant all that additional excavation and importing of materials, especially when the sub-grade is firm and stable.
However, if levels need building up; that is, if the flags would need to be laid on more than 50mm of laying course material, then a sub-base is cheaper and easier than building up with additional sand/cement.
However, if levels need building up; that is, if the flags would need to be laid on more than 50mm of laying course material, then a sub-base is cheaper and easier than building up with additional sand/cement.
Site Agent - Pavingexpert