I'm as lost as you are Tone!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 2
- Joined: Tue Nov 20, 2007 4:55 pm
- Location: berkshire
-
- Posts: 127
- Joined: Mon Nov 05, 2007 5:37 pm
- Location: Surrey
- Contact:
Found this at "askthebuilder.com" , hope it helps
"Weather conditions are very important when it comes to these surfaces and their installation. Hot, dry early summer weather almost always offers the best conditions. The liquid asphalt sticks best to warm dry surfaces. It also sticks to falling leaves and flower petals! This means that you don't want these things around when you are installing a tar and chip surface.
Air and surface temperature are critical. It is important that once the hot liquid asphalt is sprayed that it does not chill or cool before the loose chips are scattered across the asphalt. In fact, in most applications, the chips are usually installed within 1 to 2 minutes. The faster the chips are installed, the better chance they have of sticking to the liquid asphalt cement.
If you have to use an emulsified asphalt, be careful of rain. If it rains before the emulsifying agent evaporates, your asphalt can wash away!"
...................................................................................
I used to work for a company that did "tar and chip" The preparation could be carried out anytime of the year, we only ever did the top coating from March through till October/ September. If it was too cold there was trouble with the tar going cold too fast and sometimes solidifying in the machine hoses.
The only thing with tar and chip driveways is that after a year or two or the chippings start wearing where the car has been driving (especially turning) and your left with bald spots that need topping up. Also If you have overhanging trees, when it comes to autumn trying to sweep up leaves is a complete nightmare, and using a leaf blower can blow small loose chippings away, in my humble opinion 20mm shingle on a crushed lime type 1 base would be better.
"Weather conditions are very important when it comes to these surfaces and their installation. Hot, dry early summer weather almost always offers the best conditions. The liquid asphalt sticks best to warm dry surfaces. It also sticks to falling leaves and flower petals! This means that you don't want these things around when you are installing a tar and chip surface.
Air and surface temperature are critical. It is important that once the hot liquid asphalt is sprayed that it does not chill or cool before the loose chips are scattered across the asphalt. In fact, in most applications, the chips are usually installed within 1 to 2 minutes. The faster the chips are installed, the better chance they have of sticking to the liquid asphalt cement.
If you have to use an emulsified asphalt, be careful of rain. If it rains before the emulsifying agent evaporates, your asphalt can wash away!"
...................................................................................
I used to work for a company that did "tar and chip" The preparation could be carried out anytime of the year, we only ever did the top coating from March through till October/ September. If it was too cold there was trouble with the tar going cold too fast and sometimes solidifying in the machine hoses.
The only thing with tar and chip driveways is that after a year or two or the chippings start wearing where the car has been driving (especially turning) and your left with bald spots that need topping up. Also If you have overhanging trees, when it comes to autumn trying to sweep up leaves is a complete nightmare, and using a leaf blower can blow small loose chippings away, in my humble opinion 20mm shingle on a crushed lime type 1 base would be better.
ooo0
( ) 0ooo
\ ( ( )
\_) ) /
(_/
I've just screeded that!!!!!!!
( ) 0ooo
\ ( ( )
\_) ) /
(_/
I've just screeded that!!!!!!!
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
i think 10mm shingle would be to big to stick to a thin layer of asphaltjanewhite wrote:many thanks for the comments. Having asked for clarification cold tar molasses is a cold tar emulsion. The spec we have is for holes to be filled with basecoat ashphalt and then for tar emulsion to be spread and then topped with the 10mm shingle. Does this sound any better?
what is the existing surface?
i would have thought that with a tar and chip the aggregate would have to be quite small,say 4-6mm
regards LLL
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
The surface dressing will need to be done on a dry, warm day for it to be a success. This is why you see so much surface dressing work on the roads during the summer months.
Forget doing it on a damp cold day......
tbh, I'd suggest the whole job is left until spring. I could post up a pic of a tar and chip job we were involved in a few weeks ago, when it was dry and warm!
Forget doing it on a damp cold day......
tbh, I'd suggest the whole job is left until spring. I could post up a pic of a tar and chip job we were involved in a few weeks ago, when it was dry and warm!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Would be cheaper to channel plane it and resurface it in it's entirety!!seanandruby wrote:a stretch of road between seaford and newhaven gets done almost every year.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
My old man feeds his cows molasses it's a by product of sugar cane refining and they go mad for it. You could smear it on a brick and they'd eat the whole thing so think your contractor has his wording mixed up or else it would make a good you tube clip. Cow eats driveway :laugh:
Can't see it from my house
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Pablo - not one to mince his words!!Pablo wrote:Nice one mate you should have a spot on this site titled random sh*te and after dinner anecdotes a spot called top tip for the day would be good too.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 368
- Joined: Tue Sep 25, 2007 7:20 pm
- Location: darwen
- Contact: