I'm currently using up some of my hard earned holiday on a little landscaping in the back garden. Specifically I'm building a small set of steps to the conservatory using the previously mentioned wetherdale paving slabs.
My construction is 150mm slab (although it's not really big enough to call a slab, more of an overgrown strip footing), maximum five courses of bricks to support paving flags, hollows in brick construction to be filled with 'ballast' (tamped down) to support centre of flags (I broke too many flags laying the patio to trust them to hold my weight without central support).
I've two questions that I can't find appropriate answers to:
1) Now the slab's been laid, how long does it need to cure before I can start brick laying? I'm trying to keep the 'programme' as short as possible (domestic reasons) ???
2) Can I use ballast supplied for mixing concrete as the 'ballast' in the centre of the construction, or should I be looking at a different aggregate?
Simple enough questions that appear to be so simple that I can't find answers easily.
My construction is 150mm slab (although it's not really big enough to call a slab, more of an overgrown strip footing), maximum five courses of bricks to support paving flags, hollows in brick construction to be filled with 'ballast' (tamped down) to support centre of flags (I broke too many flags laying the patio to trust them to hold my weight without central support).
I've two questions that I can't find appropriate answers to:
1) Now the slab's been laid, how long does it need to cure before I can start brick laying? I'm trying to keep the 'programme' as short as possible (domestic reasons) ???
2) Can I use ballast supplied for mixing concrete as the 'ballast' in the centre of the construction, or should I be looking at a different aggregate?
Simple enough questions that appear to be so simple that I can't find answers easily.
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
not sure if i have picked this up right
but what i usually do is concrete a slab (as you have done)
then work out the height from the slab to the finished slab height
lets say this is 1m
so this leaves 5 steps of 200mm
which is 2 course of bricks then a slab
then 2 courses of bricks again then andother slab etcetc
as i build the 2 course of brickwork (always in 9" or 225mm) i infill this with leanmix
i then bed the slab onto a thin bed or grit sand mortar,tap it down with a mallet then build the next 2 course of brickkwork
ad infinitum
risers should be no more than 225mm and should all be even
treads should be even too but in garden i always try and allow at least 450 mm to walk on as long as the site permits it
hope this helps
cheers LLL
BTW your in early sean ?? rained off?
LLL
but what i usually do is concrete a slab (as you have done)
then work out the height from the slab to the finished slab height
lets say this is 1m
so this leaves 5 steps of 200mm
which is 2 course of bricks then a slab
then 2 courses of bricks again then andother slab etcetc
as i build the 2 course of brickwork (always in 9" or 225mm) i infill this with leanmix
i then bed the slab onto a thin bed or grit sand mortar,tap it down with a mallet then build the next 2 course of brickkwork
ad infinitum
risers should be no more than 225mm and should all be even
treads should be even too but in garden i always try and allow at least 450 mm to walk on as long as the site permits it
hope this helps
cheers LLL
BTW your in early sean ?? rained off?
LLL
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
I had assumed lost boy had his steps worked out. We never ever get weathered off. had my op last week ( bone taken out of thumb ). should be off 8 / 10 weeks. I'm going back next week tho I'm bored already. took the advice off the brew cabin regulars and selling a bit on eBay. my arse is killing me more than my hand, don't know how office bods do it. as tony said on his blog " monging out" :laugh:
sean
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Same here, we never get rained off!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 10
- Joined: Thu May 03, 2007 3:10 pm
- Location: London
Thanks for the advice LLL.
I have got the steps already worked out. The distance between the where the top of the steps needs to be and the ground level varies between 230mm and 250mm, so I've taken a nominal figure of 240mm. Too big for one riser, so I'm going for two risers of 120mm each (nice shallow steps... in case we have 'joyful' news and for when I'm an old bugger) with a 440mm tread depth. This is of course going to cause me all sorts of problems (although I have a plan) because 120mm doesn't break down to a nice number of courses of bricks, but the alternative was uneven risers which would have meant I'd have fallen over every time I went into the garden.
I am quite intrigued by the idea of using a lean mix for filling (mainly because I get to turn the cement mixer on again - as a desk pilot it's a novelty).
Thanks for the advice.
I have got the steps already worked out. The distance between the where the top of the steps needs to be and the ground level varies between 230mm and 250mm, so I've taken a nominal figure of 240mm. Too big for one riser, so I'm going for two risers of 120mm each (nice shallow steps... in case we have 'joyful' news and for when I'm an old bugger) with a 440mm tread depth. This is of course going to cause me all sorts of problems (although I have a plan) because 120mm doesn't break down to a nice number of courses of bricks, but the alternative was uneven risers which would have meant I'd have fallen over every time I went into the garden.
I am quite intrigued by the idea of using a lean mix for filling (mainly because I get to turn the cement mixer on again - as a desk pilot it's a novelty).
Thanks for the advice.
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 10
- Joined: Thu May 03, 2007 3:10 pm
- Location: London
The tarp doesn't run under the stairs! :laugh: It's got a great big pile of muck on it that's going to be taken to the tip next weekend.
The plan for next spring is to have two flowerbeds either side of the steps (that's a job for the weekend after next once the muck's gone) and grass laid to the front edge of the steps.
The plan for next spring is to have two flowerbeds either side of the steps (that's a job for the weekend after next once the muck's gone) and grass laid to the front edge of the steps.
-