Im laying 90m2 of block paving on drive way. how do i know when ive laid and compacted 100mm of type 1 evenly across the drive, before screeding with sand? thanks
pull a line across from pins, or , stakes at finished levels and dip down to required height of mot. level plus, or minus 10ml. then compact to refusal. all this info is on the main index.