Mixing building sand with type 1
-
- Posts: 28
- Joined: Fri Oct 13, 2006 6:48 pm
- Location: West Sussex
I have a bulk bag of building sand, which I think may have a high clay content. It makes terrible mortar, so I was initially going to use it for blinding on top of type 1 for my garage concrete slab. I’ve since found out that sharp sand should be used for this and have some on order.
Do you think it would be alright to mix it in with the type 1? It would be a ratio of 8 bags of type 1 to 1 of building sand. I was thinking about laying it on the ground under the type 1. (5.52m x 4.84m)
Also, LLL recommended using Flexcell for an expansion joint. This may be a silly question, but would you place it on the outside or inside of the membrane?
Thanks
Do you think it would be alright to mix it in with the type 1? It would be a ratio of 8 bags of type 1 to 1 of building sand. I was thinking about laying it on the ground under the type 1. (5.52m x 4.84m)
Also, LLL recommended using Flexcell for an expansion joint. This may be a silly question, but would you place it on the outside or inside of the membrane?
Thanks
Hello trevor
the flexcell strips...what normally happens is you put the roadform (or timber shutter) up after laying the polythene so the forms are struck, you have a nice slab edge with just a couple (!?) of inches of polythene showing at the bottom. Do the pour, strike the shutter then slap a bit of adhesive to the side where the shutter was, put the bitufibre or flexcell on and there you go...
Tony the Boss is probly better qualified than I (Grammar) to advise on the type1 & sand mix
hope it helps
the flexcell strips...what normally happens is you put the roadform (or timber shutter) up after laying the polythene so the forms are struck, you have a nice slab edge with just a couple (!?) of inches of polythene showing at the bottom. Do the pour, strike the shutter then slap a bit of adhesive to the side where the shutter was, put the bitufibre or flexcell on and there you go...
Tony the Boss is probly better qualified than I (Grammar) to advise on the type1 & sand mix
hope it helps
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
"the flexcell strips...what normally happens is you put the roadform (or timber shutter) up after laying the polythene so the forms are struck, you have a nice slab edge with just a couple (!?) of inches of polythene showing at the bottom. Do the pour, strike the shutter then slap a bit of adhesive to the side where the shutter was, put the bitufibre or flexcell on and there you go"...
...Am i missing something here, why would you put an expansion joint outside a finished slab? surely it should go around the inside where it abuts the walls? if it is for the next slab, then the polythene should have a 300 ml overlap, and maybe dowel bars? sorry if this sounds pedantic. ???
...Am i missing something here, why would you put an expansion joint outside a finished slab? surely it should go around the inside where it abuts the walls? if it is for the next slab, then the polythene should have a 300 ml overlap, and maybe dowel bars? sorry if this sounds pedantic. ???
sean
-
- Posts: 28
- Joined: Fri Oct 13, 2006 6:48 pm
- Location: West Sussex
Thanks you all for your help.
Yes, the slab will be laid within the walls. I have just finished laying the type 1 and sand blinding, today.
I will be laying the slab in two parts.
From what I have read, the slab needs to have a slope towards the garage door. So I will fix a sloping batten to the top of brickwork on one side and have a sloping shuttering board halfway across the slab. I just didn't know if the Flexcell should go inside or outside the DPM?
My guess is inside.
It's like most things, once you do them once or see them done, everything slots into place.
Laying this slab will be a big turning point in the building project for me, I've wasted so much time trying to keep it all dry.
Yes, the slab will be laid within the walls. I have just finished laying the type 1 and sand blinding, today.
I will be laying the slab in two parts.
From what I have read, the slab needs to have a slope towards the garage door. So I will fix a sloping batten to the top of brickwork on one side and have a sloping shuttering board halfway across the slab. I just didn't know if the Flexcell should go inside or outside the DPM?
My guess is inside.
It's like most things, once you do them once or see them done, everything slots into place.
Laying this slab will be a big turning point in the building project for me, I've wasted so much time trying to keep it all dry.
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 28
- Joined: Fri Oct 13, 2006 6:48 pm
- Location: West Sussex
Thanks for that Sean
How would you normally fix the flexi board to the wall? Is it ok for the fixings to puncture the membrane?
Each half of the slab will be 2.76m x 4.84m and averaging 150mm thick - would you bother with steel reinforcing for that size?
I will be up at the builders merchants first thing tomorrow to see what this flexi board is like.
How would you normally fix the flexi board to the wall? Is it ok for the fixings to puncture the membrane?
Each half of the slab will be 2.76m x 4.84m and averaging 150mm thick - would you bother with steel reinforcing for that size?
I will be up at the builders merchants first thing tomorrow to see what this flexi board is like.
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
sorry trevor...i got the shitey end of the stick as per usual...what I described was for bays, not a garage...should have read what you were after m8.
the flexi board...if you use the white foam stuff you have to be careful, cos i think that has its own adhesive...others just eat through it.
sean sounds like he knows more about joints than me...mine usually end up soggy with lots of little burns on my shirt...
:;):
the flexi board...if you use the white foam stuff you have to be careful, cos i think that has its own adhesive...others just eat through it.
sean sounds like he knows more about joints than me...mine usually end up soggy with lots of little burns on my shirt...
:;):
-
- Posts: 28
- Joined: Fri Oct 13, 2006 6:48 pm
- Location: West Sussex
Well, I’ve now laid my slab. I stuck the Fillcrete to the side of the DPM with grab adhesive.
I decided to use battens in the end because I didn’t think the Fillcrete would hold its edge when I tamped the concrete.
I got Mixa-mate in for the concrete. Went for a belt & braces approach regarding reinforcing, and used steel mesh and fibres.
I’m a happy man!
Thanks again for all your help
All the best
Trevor
I decided to use battens in the end because I didn’t think the Fillcrete would hold its edge when I tamped the concrete.
I got Mixa-mate in for the concrete. Went for a belt & braces approach regarding reinforcing, and used steel mesh and fibres.
I’m a happy man!
Thanks again for all your help
All the best
Trevor
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 28
- Joined: Fri Oct 13, 2006 6:48 pm
- Location: West Sussex
Mixamate were ok, I would use them again. Maybe I was lucky with the driver/operator!
I needed approx 2 metres for each half of the slab and I didn't know if premix companies worked in tenths of a metre! so Mixamate seemed the best option. The worst scenario would have been if I had ordered exactly 2m from Readymix and found the slab was 5mm too low!
I will post some pictures soon, it's starting to look good now.
This is the bit I have been looking forward to, building up the walls from the DPC level using my "Brickie" contraption. If I'm not happy with my speed or quality of work though, I will get a real bricky in to do the work.
I am using the Dartmoor Heathers you recommended. Like you said, they are a much better brick than the LBC Heather.
I needed approx 2 metres for each half of the slab and I didn't know if premix companies worked in tenths of a metre! so Mixamate seemed the best option. The worst scenario would have been if I had ordered exactly 2m from Readymix and found the slab was 5mm too low!
I will post some pictures soon, it's starting to look good now.
This is the bit I have been looking forward to, building up the walls from the DPC level using my "Brickie" contraption. If I'm not happy with my speed or quality of work though, I will get a real bricky in to do the work.
I am using the Dartmoor Heathers you recommended. Like you said, they are a much better brick than the LBC Heather.
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire