Concrete slab

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
Phil H
Posts: 11
Joined: Mon May 01, 2006 9:32 pm
Location: Herts

Post: # 20974Post Phil H

Had my slab poured some 4 weeks ago.. had it covered and kept it lightly sprayed for over 1 week, everything appears to be ok. Have been on holiday for last 2 weeks i had left it loosely covered but on return from holiday have found that someone or somehow the cover has been completely removed, and with all this rain for last couple of weeks has certainly taken a wet pounding. My question, will all this rain so soon after being laid have any adverse effects on the concrete overall curing process.. The sectional building is being erected in next few weeks but not to be used for a while yet.
Interested in your views.

Phil
Regards
Phil

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 20984Post lutonlagerlout

no problem at all phil IMHO
extreme heat or cold could be a problem ,but AFAIK concrete reaches its full structural strength after 1 week,and they build motorway bridges from it :)
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 20987Post Ted

I thought it gained strength quickest during the first week but really keeps on getting stronger during the first 28 days.

It then keeps on getting stronger but the speed it gains strength slows and as it is pretty strong after a month it is not that important whether it gets any stronger...

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 20990Post lutonlagerlout

i had some lintels made by a concrete firm ted and they told me i couldnt use them till 7 days after manafacture.
i dont think rain water is any kind of problem for dry concrete though is it?
regards LLL ???
"what,you want paying today??"

YOUR TEXT GOES HERE

Phil H
Posts: 11
Joined: Mon May 01, 2006 9:32 pm
Location: Herts

Post: # 20993Post Phil H

Thanks guys for your input. I just imagined all the pools of water sitting on the top would not help anything. I imagine looking at the side views of the slab that it was still quite damp undeneath, the slab is some 15 inches thick max. No doubt when the concrete building is up and secured condensation may well form for sometime inside. Would i be better using a Dehumidifier to help the drying out process or just leave alone for as long as possible.
Regards
Phil

matt h
Posts: 607
Joined: Mon Jul 09, 2007 11:14 pm
Location: gosport

Post: # 21003Post matt h

try using blowers in combination with dehumidifiers, as speeds up removal of excess moisture. will you be screeding over?
general builder, maintenance engineer, gas and plumbing installations, extensions etc

matt h
Posts: 607
Joined: Mon Jul 09, 2007 11:14 pm
Location: gosport

Post: # 21004Post matt h

If you experience condensation try using blowers in combination with dehumidifiers, as speeds up removal of excess moisture. will you be screeding over? Laying of floor leveling compounds often increases condensation formation until fully cured, so ensure there is adequate airflow.:rock:
general builder, maintenance engineer, gas and plumbing installations, extensions etc

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 21005Post Ted

lutonlagerlout wrote:i had some lintels made by a concrete firm ted and they told me i couldnt use them till 7 days after manafacture.
i dont think rain water is any kind of problem for dry concrete though is it?
regards LLL ???
I think you only have to wait longer than a week if making something like a dam!

I don't think rainwater is a problem normally once it has hardened.

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 21010Post lutonlagerlout

from what i heard ted there is crete in the hoover dam that hasn't set yet ,they were pouring that fast
and i quote wikipedia
The first concrete was placed into the dam on June 6, 1933. Since no structure the magnitude of Hoover Dam had been constructed, many of the procedures used in construction of the dam were untried. Since concrete heats up and contracts as it cures un-even cooling and contraction of the concrete posed a serious problem. The Bureau of Reclamation engineers calculated that if the dam were built in a single continuous pour, the concrete would have taken 125 years to cool to ambient temperature. The resulting stresses would have caused the dam to crack and crumble.[4] To solve this problem the dam was built in a series of interlocking trapezoidal columns. Each pour was no more than 6-inches deep. Because of this depth it is extremely unlikely that construction workers were accidentally buried alive in the concrete, contrary to popular folklore.[5]. To further cool the concrete each form contained cooling coils of 1 inch (25.4 mm) thin-walled steel pipe. River water was circulated through these pipes to help dissipate the heat from the curing concrete. After this chilled water from a refrigeration plant on the lower cofferdam was circulated through the coils to further cool the concrete. After each layer had sufficiently cooled the cooling coils were cut off and pressure grouted by pneumatic grout guns. The concrete is still curing and gaining in strength as time goes on.[6]

There is enough concrete in the dam to pave a two-lane highway from San Francisco to New York [7].

regards LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 21020Post Ted

Someone told me about a dam on Megastructures once but I didn't see it...

This is from Portland Cement Association:

What does 28 -day strength mean?

Concrete hardens and gains strength as it hydrates. The hydration process continues over a long period of time. It happens rapidly at first and slows down as time goes by. To measure the ultimate strength of concrete would require a wait of several years. This would be impractical, so a time period of 28 days was selected by specification writing authorities as the age that all concrete should be tested. At this age, a substantial percentage of the hydration has taken place.


http://www.cement.org/basics/concretebasics_faqs.asp