Thanks all again for previous assistance. It' been invaluable to me. My next job is for a Driveline Elite Drive. And my question is re setting out the edgings to suit bond. With a herringbone pattern the blocks are just cut to the edges wherever they meet. With a straight line (staggered bond) pattern such as would suit the above, what's the best way to ensure that I don't meet the edge with an unsightly split? It's not like brickwork where I would set out to suit, or just open or squeeze the joints.
Excuse all the questions, but branching out from site bricklaying raises a few questions for me.
Pag'
Setting out edgings for driveline elite
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 20
- Joined: Fri Apr 20, 2007 6:47 pm
- Location: East Sussex