Terms & conditions - Wordings of t&cs

General banter, tradesmen, recommendations and warnings, surplus materials, humour and owt else!
Post Reply
scoffsred
Posts: 86
Joined: Sun Apr 29, 2007 9:10 pm
Location: Cumbria

Post: # 19759Post scoffsred

alright lads, im struggling to think of the correct wording for when you want to say this estimate or quote is such n such an amount but if something unforseen is discovered while doing the job the price will have to be assesed? probably something dead straightforward, but im having a thick day or 2 and i just cant phrase it all

Cheers in adavance Dave

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 19760Post IanMelb

I've seen something like "The price stated is an estimate for the works and materials listed. If any other work is required in order to complete the project then the pricing for this new item will be agreed with both parties before continuation."

As an aside, I was once told that if you use the word 'quotation' then you have to stick to that (give or take an agreed 'contingency') whereas an estimate can vary wildly.

scoffsred
Posts: 86
Joined: Sun Apr 29, 2007 9:10 pm
Location: Cumbria

Post: # 19761Post scoffsred

a think something along those lines sounds excellent, there are so many undeterminables when you survey the job, that means you have to cover yourself eh

cheers

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 19767Post Tony McC

There used to be a contractor's T&C document on the website, but I took it down after some "advice" from a lawyer that part of it wasn't actually legal. Of course, he wanted paying to tell me which part and how it could be rectified, so I told him to bugger off and just took down the T&Cs.

That's summat else I can add to my list of "things to do when I get a moment". It can go in, with a bullet, at number 347!
Site Agent - Pavingexpert

Stuarty
Posts: 637
Joined: Sat Mar 18, 2006 7:35 pm
Location: Edinburgh

Post: # 19803Post Stuarty

My boss had a bit of a wrangle with a lawyer of some sorts, apparantly his T&Cs were a bit on the vague side so there was a spell when the lawyer geezer, our client tried to not pay the bill cos of the vagueness. Then the boss got his legal-eagle to make it better.

enigmaenigma
Posts: 83
Joined: Sat Mar 10, 2007 10:17 pm
Location: x

Post: # 19808Post enigmaenigma

Don’t know if this is any good or not
All prices or timescales involved are for meant for estimate purposes only and as such maybe subject to change due to force majeure in regards the following

The cost, supply or availability of materials

Unforeseen factors that are not identifiable during the course of a routine site inspection and only become identified as a result of the commencement of the works

And weather conditions that can obstruct or affect the time schedule or quality of the works involved



Not to happy with using the term “force majeure� – in its strictest sense it means act of god or outside your control and although it is applicable it doesn't sit right, but I couldn't think of anything else at this time LOL
~ Signature gone to lunch, please call back in 1/2 an hour ~

scoffsred
Posts: 86
Joined: Sun Apr 29, 2007 9:10 pm
Location: Cumbria

Post: # 19951Post scoffsred

thanks enigma that looks blob on to me ill use that i think, better bein safe than sorry.

mouldmaker
Posts: 221
Joined: Fri Jun 11, 2004 11:17 pm
Location: south east UK
Contact:

Post: # 19964Post mouldmaker

My T&C covers most things, although as manufacturers we're in a different field. And they're legal, as we paid a lawyer a small fortune to compile them. If there's anything in there that will help, feel free to lift it:

http://www.albionart.co.uk/terms.pdf

scoffsred
Posts: 86
Joined: Sun Apr 29, 2007 9:10 pm
Location: Cumbria

Post: # 19994Post scoffsred

cheers for that its probably to long winded for what i want lol

Post Reply