Hi
I am currently designing an extension toa factory. I am adding an new portal frame building with eaves gutters & downpipes. Building control are asking me to trap the outlets at ground level where my intention was just to simply connect to the below groud system and pat access covers just above ground level on the RWP's. The drainage system is separate.
Anyone have any idea why traps are requested?
Cheers
Scaifee
Traps on surface water drains - Traps on surface water drains
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire