Terms & conditions - Wordings of t&cs
-
- Posts: 86
- Joined: Sun Apr 29, 2007 9:10 pm
- Location: Cumbria
alright lads, im struggling to think of the correct wording for when you want to say this estimate or quote is such n such an amount but if something unforseen is discovered while doing the job the price will have to be assesed? probably something dead straightforward, but im having a thick day or 2 and i just cant phrase it all
Cheers in adavance Dave
Cheers in adavance Dave
-
- Site Admin
- Posts: 417
- Joined: Wed Apr 11, 2007 11:53 am
- Location: East Riding
I've seen something like "The price stated is an estimate for the works and materials listed. If any other work is required in order to complete the project then the pricing for this new item will be agreed with both parties before continuation."
As an aside, I was once told that if you use the word 'quotation' then you have to stick to that (give or take an agreed 'contingency') whereas an estimate can vary wildly.
As an aside, I was once told that if you use the word 'quotation' then you have to stick to that (give or take an agreed 'contingency') whereas an estimate can vary wildly.
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
There used to be a contractor's T&C document on the website, but I took it down after some "advice" from a lawyer that part of it wasn't actually legal. Of course, he wanted paying to tell me which part and how it could be rectified, so I told him to bugger off and just took down the T&Cs.
That's summat else I can add to my list of "things to do when I get a moment". It can go in, with a bullet, at number 347!
That's summat else I can add to my list of "things to do when I get a moment". It can go in, with a bullet, at number 347!
Site Agent - Pavingexpert
-
- Posts: 637
- Joined: Sat Mar 18, 2006 7:35 pm
- Location: Edinburgh
-
- Posts: 83
- Joined: Sat Mar 10, 2007 10:17 pm
- Location: x
Don’t know if this is any good or not
Not to happy with using the term “force majeure� – in its strictest sense it means act of god or outside your control and although it is applicable it doesn't sit right, but I couldn't think of anything else at this time LOL
All prices or timescales involved are for meant for estimate purposes only and as such maybe subject to change due to force majeure in regards the following
The cost, supply or availability of materials
Unforeseen factors that are not identifiable during the course of a routine site inspection and only become identified as a result of the commencement of the works
And weather conditions that can obstruct or affect the time schedule or quality of the works involved
Not to happy with using the term “force majeure� – in its strictest sense it means act of god or outside your control and although it is applicable it doesn't sit right, but I couldn't think of anything else at this time LOL
~ Signature gone to lunch, please call back in 1/2 an hour ~
-
- Posts: 221
- Joined: Fri Jun 11, 2004 11:17 pm
- Location: south east UK
- Contact:
My T&C covers most things, although as manufacturers we're in a different field. And they're legal, as we paid a lawyer a small fortune to compile them. If there's anything in there that will help, feel free to lift it:
http://www.albionart.co.uk/terms.pdf
http://www.albionart.co.uk/terms.pdf