Blockwork in hot weather - Any precautions/advice?

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 19700Post IanMelb

I think one of the main problems I've encountered with heavy blockwork is that it seems very difficult to 'tap' the block level and into place. Lighter bricks and the like can be tapped down into the mortar, heavy concerete blocks have already compressed the mortar so there's very little 'give' left in it.

This is one of those things where experience is almost a necessity - knowing how much mortar to lay down and in what fashion to give a level course is something that isn't just picked up in a day ... ???

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 19734Post IanMelb

Image

Seen one course of blockwork, seen 'em all

Note the 'creter' at the bottom right and the metal studding with protective bottles on it

The blocks were salvaged ones so had plenty of voids to fill with mortar round their edges. :D

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 19735Post lutonlagerlout

those perps look a tad large Ian,10-12 mm is recommended on blocks
see that bottom left hand corner where 2 blocks abutt each other??
when you start your next course start with a 330mm cut and a 110 mm cut next to it
this brings you back to half bond :)
nice work
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

IanMelb
Site Admin
Posts: 417
Joined: Wed Apr 11, 2007 11:53 am
Location: East Riding

Post: # 19742Post IanMelb

Yeah, some of them are up to 20mm (the ones round the studding are the worst) :( - it's lousy pointing as well, the mortar has spread a little cos the edges of the blocks are quite rounded.

I wouldn't be happy if I was going to build a masonry building off it, but it'll do for my timber frame (I hope)

I may tie it all together when it put the second course on. Maybe some strapping across the face of the blocks.

when you start your next course start with a 330mm cut and a 110 mm cut next to it


Is that a 330mm going 'up' (towards the wacker) and a 110 going 'right' ?

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 19744Post lutonlagerlout

Is that a 330mm going 'up' (towards the wacker) and a 110 going 'right' ?

affirmative :)
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Post Reply