Pic driveway - advice please
-
- Posts: 585
- Joined: Tue Aug 29, 2006 9:02 pm
- Location: Luanda, Angola
There appear to be two parts to your case...
a) Is the paving acceptable in terms of the visual appearance?
(You saw brochures and were led to believe that the PIC would look like the pictures. You feel that it doesn't and you need to prove this).
b) Was the work carried out with reasonable skill and care?
(The fact that there is aggregate near the surface suggests not and there appears to be a lack of CSH).
Proving the latter is much easier than the former, I would have thought.
a) Is the paving acceptable in terms of the visual appearance?
(You saw brochures and were led to believe that the PIC would look like the pictures. You feel that it doesn't and you need to prove this).
b) Was the work carried out with reasonable skill and care?
(The fact that there is aggregate near the surface suggests not and there appears to be a lack of CSH).
Proving the latter is much easier than the former, I would have thought.
-
- Posts: 28
- Joined: Sun Mar 11, 2007 5:13 pm
- Location: uk
I don't think either part should be hard to prove!Ted wrote:There appear to be two parts to your case...
a) Is the paving acceptable in terms of the visual appearance?
(You saw brochures and were led to believe that the PIC would look like the pictures. You feel that it doesn't and you need to prove this).
b) Was the work carried out with reasonable skill and care?
(The fact that there is aggregate near the surface suggests not and there appears to be a lack of CSH).
Proving the latter is much easier than the former, I would have thought.
-
- Posts: 28
- Joined: Sun Mar 11, 2007 5:13 pm
- Location: uk
The size of the whole area is 80m2.Ted wrote:I hope you haven't paid him in full!
What percentage of the cost he quoted have you paid?
What size is the area he did?
What was his price for the job if you don't mind me asking?
30m2 of this the garage is now built on.
The remaining 50m2 is shown in the photographs.
At the time of completion it looked ok (I have some photos of this), it has just got worse and worse as time has gone on.
The price for the job was £4800 and it has been paid in full. As i said before this was the middle quotation out of the three.
-
- Posts: 585
- Joined: Tue Aug 29, 2006 9:02 pm
- Location: Luanda, Angola
-
- Posts: 28
- Joined: Sun Mar 11, 2007 5:13 pm
- Location: uk
-
- Posts: 28
- Joined: Sun Mar 11, 2007 5:13 pm
- Location: uk
I have already had one quote of £4000 to relay the 50m2. I have also been with them to a job they are currently doing. 18 months ago they did the drive and they wanted me to see it now to show how it should look. They were back at the property doing a patio to match the rest of the work. I do not want or trust the original contractor to redo the job and am prepared to accept a partial refund at this stage but if i take him to court I will go for the full refund.