Making good progress on my drive thanks to this site however have a quick question (or 2).
Firstly, after reading about edgings i have nearlyh done the perimeter of my drive in a charcoal soldier course but have existing concrete edgings on the side adjacent to the footpath. Do i have to bed my soldier course on dry mix here as well as surely i can use the existing concrete edging strips to screed from and lay the soldier when i do the main block laying on sand..is there any advantage either way?. Secondly I am constructing my step detail this weekend, i obviously done use a wacker on the screed so is hand compacting and trampling enough or is there another method?
Thanks all.
Darren
Getting there!!!
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 9
- Joined: Mon May 14, 2007 12:59 pm
- Location: MK
thanks as usual LLL
Was hoping to get out there this weekend and progress a bit further but the weather is looking lousy. Booked some time off work though next week to hopefully get it finished.
Im all sorted now, just need to find the best way of fixing these trammel bars so they dont move when i do the big screed ???
Was hoping to get out there this weekend and progress a bit further but the weather is looking lousy. Booked some time off work though next week to hopefully get it finished.
Im all sorted now, just need to find the best way of fixing these trammel bars so they dont move when i do the big screed ???
Darren
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
After: spread and roughly level the laying course sand, the make just a pass or two (no more) with the compactor to semi-consolidate the sand.
Next, scrape a groove in the semi-compacted sand and place your screed rails.
Adjust the level as required, and then backfill around them with scraped-out sand, compressing it as you go.
With a bit of luck, the screed rails will stay put when you draw the screed board over them.
Next, scrape a groove in the semi-compacted sand and place your screed rails.
Adjust the level as required, and then backfill around them with scraped-out sand, compressing it as you go.
With a bit of luck, the screed rails will stay put when you draw the screed board over them.
Site Agent - Pavingexpert