Subbase - Water logged mot
-
- Posts: 43
- Joined: Tue May 15, 2007 5:49 pm
- Location: derby
Its probably been said thousands of times, but this site is the absolute dogs testicular and some.
I have recently put down 150 mm of Mot ( deeper in places ) over a 200 m2 area. Since laying the Mot it has persisted down with rain lots, after compacting with a roller I noticed some areas had taken on a spongy caricature quite visibly moving up and down when trod on. Will this problem rectify itself as the Mot dries out or am I in trouble
I have recently put down 150 mm of Mot ( deeper in places ) over a 200 m2 area. Since laying the Mot it has persisted down with rain lots, after compacting with a roller I noticed some areas had taken on a spongy caricature quite visibly moving up and down when trod on. Will this problem rectify itself as the Mot dries out or am I in trouble
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Yeah - once it has dried out, it'll be hard-as.
What are you putting on top of the stone?
What are you putting on top of the stone?
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 43
- Joined: Tue May 15, 2007 5:49 pm
- Location: derby
Yes your right its rock solid after a couple of dryish days. Thanks for your input. Will be laying Woburn rumbled on top, after we finish laying the 60 odd linear meters of edging.
Some jobs run like clock work and some jobs are besieged by problems, this is one of those jobs.
This project is on a larger scale than I have taken on before, but felt it was time to step up a gear, So subsequently contracted out the excavation work. After throwing a sicky on the first day the JCB driver turned up and got stuck in. He seemed like a decent lad but after spending two days with him I realised his standards where perhaps not quite as high as my own. During the excavation he managed to take some not insignificant chunks of brick of two corners on the property and managed to bend the rather posh gates while using then to get some leverage on a tree root he come across. ( this is a four hundred thousand plus property). He also dug out way to deep in places, costing me an extra 20 tonnes of Mot. I spoke to his boss on the phone who agreed to visit the site and assess the damage, after looking he said he would knock £100 of the bill. I’m not that handy with metal work and replacing bricks on this period property is a job for a quality brick layer. I reckon I’m looking at a bill approaching the £400 mark. I have withheld payment until I have spoken with the customer, who is away for a few days but am being bombarded by phone calls from the contractor demanding payment,
Any comments on this post would be gratefully received.
Some jobs run like clock work and some jobs are besieged by problems, this is one of those jobs.
This project is on a larger scale than I have taken on before, but felt it was time to step up a gear, So subsequently contracted out the excavation work. After throwing a sicky on the first day the JCB driver turned up and got stuck in. He seemed like a decent lad but after spending two days with him I realised his standards where perhaps not quite as high as my own. During the excavation he managed to take some not insignificant chunks of brick of two corners on the property and managed to bend the rather posh gates while using then to get some leverage on a tree root he come across. ( this is a four hundred thousand plus property). He also dug out way to deep in places, costing me an extra 20 tonnes of Mot. I spoke to his boss on the phone who agreed to visit the site and assess the damage, after looking he said he would knock £100 of the bill. I’m not that handy with metal work and replacing bricks on this period property is a job for a quality brick layer. I reckon I’m looking at a bill approaching the £400 mark. I have withheld payment until I have spoken with the customer, who is away for a few days but am being bombarded by phone calls from the contractor demanding payment,
Any comments on this post would be gratefully received.
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Jesus Christ - what a situation...... not good.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 70
- Joined: Tue Jun 29, 2004 5:27 am
-
- Posts: 43
- Joined: Tue May 15, 2007 5:49 pm
- Location: derby
Sorry Dan repairs have already been done, found an old school builder who did a first class job. He could not source an exact match, so took some bricks from an inconspicuous part of the building,you have to look closly to spot the repair.
The jobs finished now, When I sus out how to post pics I'll put some up.
Anybody know a good groundworks company in the Derby area?
The jobs finished now, When I sus out how to post pics I'll put some up.
Anybody know a good groundworks company in the Derby area?
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact: