Quotes v quotes v quotes!!!!
-
- Posts: 3
- Joined: Tue Apr 24, 2007 9:57 am
- Location: kettering
Hi - hope someone can help me.
I have recently asked 3 people to quote me for block paving c 30m2 of front garden/drive. It's a fairly simple job with little in the way of slope and I wanted rectangular blocks, similar to the ones laid by David Wilson when teh drive was originally laid.
Now, whilstI know that there woudl be a discrepancy between the quotes, I have had one at £1500, one at £3,000 and one at £4,300, all including materials and labour.
Now, if we asume that the materials cost will be the same (there shoudl be no reason why they aren't), there seesm one heck of a difference in labour costs. Also, the cheapest one was the most detailed and included a full breakdown of work plus a copy of his insurance certificate!
As a rough (and I mean rough) idea, what should i really be looking at paying? Anyone got any idea for pavers in the Kettering area???
I have recently asked 3 people to quote me for block paving c 30m2 of front garden/drive. It's a fairly simple job with little in the way of slope and I wanted rectangular blocks, similar to the ones laid by David Wilson when teh drive was originally laid.
Now, whilstI know that there woudl be a discrepancy between the quotes, I have had one at £1500, one at £3,000 and one at £4,300, all including materials and labour.
Now, if we asume that the materials cost will be the same (there shoudl be no reason why they aren't), there seesm one heck of a difference in labour costs. Also, the cheapest one was the most detailed and included a full breakdown of work plus a copy of his insurance certificate!
As a rough (and I mean rough) idea, what should i really be looking at paying? Anyone got any idea for pavers in the Kettering area???
-
- Posts: 70
- Joined: Sat Jan 07, 2006 9:38 am
- Location: West Midlands
30m2 is quite small and would normally attract a premium but £4300 is taking the P for 30m2 depending on access drainage etc look to pay a decent contractor around £50-60m2 breakdown
Grab wagon 150.00
blocks 285.00 30m2 @9.50 inc vat
mot 120.00
sand 70.00
Kiln dried 10.00
Total 635.00
so at 1500.00 the contractor still has a healthy margin depending on the cost of his labour which shoould only be 3 men 1 day 1 paver 2 labourers ie 250.00
regards
#
matthew
drivewaycompany.co.uk
Grab wagon 150.00
blocks 285.00 30m2 @9.50 inc vat
mot 120.00
sand 70.00
Kiln dried 10.00
Total 635.00
so at 1500.00 the contractor still has a healthy margin depending on the cost of his labour which shoould only be 3 men 1 day 1 paver 2 labourers ie 250.00
regards
#
matthew
drivewaycompany.co.uk
-
- Posts: 3
- Joined: Tue Apr 24, 2007 9:57 am
- Location: kettering
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 70
- Joined: Sat Jan 07, 2006 9:38 am
- Location: West Midlands
luton
we own all the plant and therefore it's included in the over heads which is obviously part of the remaining 615.00 after taking out variable costs such as labour and materials and if 3 men cannot excavate stone up and pave 30m2 in a day they want shagging.
regards
matthew
drivewaycompany.co.uk
we own all the plant and therefore it's included in the over heads which is obviously part of the remaining 615.00 after taking out variable costs such as labour and materials and if 3 men cannot excavate stone up and pave 30m2 in a day they want shagging.
regards
matthew
drivewaycompany.co.uk
-
- Posts: 3
- Joined: Tue Apr 24, 2007 9:57 am
- Location: kettering
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
I'm suprised you don't factor the machine in on the job - ours is, everytime!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
a mate of mine is a QS and he has told me to factor in 12% onto jobs for plant costs,every time something dies or goes wrong it has to be replaced,which costs a lot of money for plant.
obviously depending on the job this isnt always feasible but its worth adding a "drink " to your price for wear and tear on cutters etc.
i still cant see 3 lads doing a complete 30m driveway in a day,how are the kerbs going to go off from say 10 in the morning till 5 in the afternoon?if you have to bed an IC cover are you going to wack it the same day?
if you can do this fair play ,if you lived round these parts you would be doing them twice the speed of everyone else.
cheers LLL
obviously depending on the job this isnt always feasible but its worth adding a "drink " to your price for wear and tear on cutters etc.
i still cant see 3 lads doing a complete 30m driveway in a day,how are the kerbs going to go off from say 10 in the morning till 5 in the afternoon?if you have to bed an IC cover are you going to wack it the same day?
if you can do this fair play ,if you lived round these parts you would be doing them twice the speed of everyone else.
cheers LLL
-
- Posts: 70
- Joined: Sat Jan 07, 2006 9:38 am
- Location: West Midlands
If you have a well worked out business model depreciation serviceing is all included in your fixed costs. We have a specific model that we work to all the time when it is applied properly it works very well and keeps us competative. Gone are the days i turn up and see a nice jag on the drive and think to my self well this is money so he's going to pay more. Its all about winning the work at a sensible margin so that you can make a decent profit all year round.
regards
matthew
drivewaycompany.co.uk
regards
matthew
drivewaycompany.co.uk
-
- Posts: 70
- Joined: Sat Jan 07, 2006 9:38 am
- Location: West Midlands
-
- Posts: 190
- Joined: Sun Aug 22, 2004 7:28 pm
- Location: Cumbria
- Contact:
Matthew
Wow the perfect job. 30m2 no edging needed no manholes, no drainage, no walls - just tar to lift and blocks to lay.
In reality you get one of these jobs once every couple of years.
A standard driveway generally needs edging, drainage, manhole covers etc. Even the smallest drive needs a minimum of 2 days - to allow for haunching to go off on edging and other cement to harden
Thats why it is so difficult to price for small jobs. A 60m2 drive takes 2 days - a 20m2 drive takes 2 days. That is why there is a premium cost for smaller jobs.
Nigel
Wow the perfect job. 30m2 no edging needed no manholes, no drainage, no walls - just tar to lift and blocks to lay.
In reality you get one of these jobs once every couple of years.
A standard driveway generally needs edging, drainage, manhole covers etc. Even the smallest drive needs a minimum of 2 days - to allow for haunching to go off on edging and other cement to harden
Thats why it is so difficult to price for small jobs. A 60m2 drive takes 2 days - a 20m2 drive takes 2 days. That is why there is a premium cost for smaller jobs.
Nigel
-
- Posts: 70
- Joined: Sat Jan 07, 2006 9:38 am
- Location: West Midlands
-
- Posts: 70
- Joined: Sat Jan 07, 2006 9:38 am
- Location: West Midlands
Nigel
What happens when on your 2 day 20m2 job you have finished excavating and set your block on edge all of prob 20LM do you go home or go to another job ?? a pavers job used to be just that but when you run a business with circa 15 guys on the pay roll that does not happen. It becomes my job to plan the days and work load so every body is being productive. And believe me it aint easy along with all the other rolls i have.
regards
Matthew
What happens when on your 2 day 20m2 job you have finished excavating and set your block on edge all of prob 20LM do you go home or go to another job ?? a pavers job used to be just that but when you run a business with circa 15 guys on the pay roll that does not happen. It becomes my job to plan the days and work load so every body is being productive. And believe me it aint easy along with all the other rolls i have.
regards
Matthew
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 7
- Joined: Thu Mar 29, 2007 9:35 pm
- Location: Belgium