Just wondering whether there is a standard for access on long drain runs for SW. I know foul has to have a manhole at least every 90m, is it the same for SW?
The standards are the same for FW and for SW. 90m is the max spacing for Manholes - IC's or access chambers (as used on residential drainage) have a lesser maximum separation distance (45m)