Bizarre rendering job... - How would you approach this one????

General banter, tradesmen, recommendations and warnings, surplus materials, humour and owt else!
simeonronacrete
Posts: 373
Joined: Tue Feb 18, 2003 3:11 pm
Location: Essex
Contact:

Post: # 16305Post simeonronacrete

Ronafix is white.

It may slightly darken the cured mortar, so try it first. Most admixtures will affect appearance in some way.

You can also use white as well os ordinary Portland cement to create a lighter colour render, if that's needed.

Let me know where you are/the site is and I'll give you the most local supplier; many TP's hold it, some Buildbase, WTBurdens, BBM Support Site, independents, and our own stock.
Simeon Osen
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 16306Post Ted

I am using Snowcrete (white cement) and several grades of Dolomite as the aggregate.

Dolomite: http://www.longrakespar.co.uk/details.php?ID=103

I was also planning on using hydraulic lime alongside the Snowcrete on the walls but probably not on the vanity unit.

So the mix for the walls is 1 Snowcrete; 1 lime; 6 aggregate.
The mix for the unit is 1 Snowcrete; 6 aggregate

Gauging water to have maximum amount of waterproofer added according to manufacturer's instructions.

The job is in Battersea in south London. But I tend to stay in Peckham/Dulwich when working on London. I tend to use Abbey Rose Buildbase in Peckham, Acre Lane Timber/BM in Brixton, Merton Timber in Dulwich and occasionally Atkins Plasterers on Wandsworth Road (Clapham) which is part of TP.

simeonronacrete
Posts: 373
Joined: Tue Feb 18, 2003 3:11 pm
Location: Essex
Contact:

Post: # 16308Post simeonronacrete

Because you are adding lime (which is a plasticiser) into the mortar, this will reduce the amount of Ronafix (which amongst it's properties is being a plasticiser) you can add.

Unless you need the lime for some purpose other than as a plasticiser, I suggest you omit it.

The recommended amount of Ronafix to add to the mortar is 14 litres to 50kg of cement. You will also need 2 litres for every 4m2 of surface area as a bonding primer - one coat to the substrate, another coat between 1st and 2nd layer of render.

Travis Perkins, Peckham, 020 7639 5111.

If you need more technical/practical information it'll be easier to do it in a phone call than typing! 01279 638 700, Donna, Daniel, or Simeon.
Simeon Osen
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 16309Post Ted

Cheers Simeon. I will give you a call.

On another note, you should try and get your stuff into Abbey Rose (Buildbase) in Peckham. I know loads of builders in Peckham and none of them ever use TP (or Jewsons) in Peckham (and few use Build Center). Abbey Rose is a big builder's merchants and it is permanently full of builders buying stuff. The occasional time I have been to TP in Peckham there are never any customers. Which is good when you are in a rush but you do wonder how they survive... well I suppose that explain the prices at TP!

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 16310Post lutonlagerlout

no real point in adding lime to a cement mixture appart from plasticity ted,i use it for garden walls for that reason i.e. it improves workability much more so than febmix
hydraulic lime by definition sets under water so theoretically you could omit the cement altogether and just use hydraulic lime,aggregate and ronafix
i may be wrong in this thinking
you should see the tender we got through today
160 pages of specs for a 2 bed bungalow???
architects love it dont they hehe
good luck
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 16318Post seanandruby

may sound dum ted. but could you do it in polystyrene first to see how the mould will turn out? then if she likes the effect go for it.
sean

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 16577Post Ted

Well I have done it and been given a bottle of champagne for it too as a prezzie.

I need to wait a week for the concrete to cure before polishing and sealing it and checking that it does not leak (touch wood).

It actually looks rather good. I will post a piccie once it is sealed. I may do oe for myself but in a more modern, less hippyish, design.;)

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 16718Post Ted

Image

Image

Image

Image

flowjoe
Posts: 1136
Joined: Sun May 08, 2005 9:25 am
Location: North West

Post: # 16719Post flowjoe

Nice work Ted, how long did it take you ?

You could have found the next big thing there, the Flintstone look. Funny how things go full circle :D
http://draindomain.com

Many paths can lead to riches, few in sunlight, some in ditches

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 16720Post lutonlagerlout

very gaudi-esque ted,nice job mate
i think i saw summat like this in genoa italy
cheers LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 16721Post Ted

Very roughly it took 4 days.

1/4-1/2 a day to do the plumbing.
Almost 1 day to build the structure out of blocks
1/2 day to do scratch coat
1 long day to render using the white stuff
1/2 day to polish
A couple of hours to seal

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 16724Post Dave_L

That's stunning Ted!

Fingers crossed here for no leaks :)
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 16728Post Ted

It doesn't seem to leak.

Ideally I woud have re-adjusted the joists and put a steel in, and built off that as I built off timber joists which is not the best building practise but this was one of the more bizarre jobs I have done! Anyway, it is strongly reinforced and so, even if there is some slight timber movement, hopefully it should withstand it. The place where I did this job is worth a fortune...!!! One day a builder is going to have knock that sink to pieces as part of a redevelopmment to make flats. He will think it will only take a lad a half hour on kango to smash it up and bag it up...!!! But I reckon it will take almost 1/2 of a day for one lad to smash that thing up and get it out of the room!!! I would love to be a fly on the wall that day!!! It is very over engineered, apart from the floor joist bit.

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 16739Post Dave_L

Gotta love the windows - the look, well, COLD and DRAUGHTY!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 16744Post lutonlagerlout

they are crittals dave,a very underestimated window.
you never see them rot and they ar emega strong
cheers
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

Post Reply