just spread out the sub-base, once put down it should be roughly leveled, it should then be compacted fully. check your levels and add more subase if needed or remove in any low/high spots to bring it to within +/- 10mm of the level you are working to. the subbase has to be roughly level to within around +/- 10mm.
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Sounds about right, 5 ton compaction.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 7
- Joined: Sun Dec 17, 2006 3:12 pm
- Location: southport
-
- Posts: 637
- Joined: Sat Mar 18, 2006 7:35 pm
- Location: Edinburgh
the concrete will find its own level, but where the concrete is thinner, it is weaker.
Take a block paved driveway. If one end has 200mm MOT, and the other end has 100mm MOT thats 100mm of difference to make up with the sand, which is not acceptable. The sand would sink, no matter how much you run the plate over the top of it. Its just too deep.
Its all about keeping things uniform. if you screw up your levels at the start, the whole job can just fall to pieces around you.
Take a block paved driveway. If one end has 200mm MOT, and the other end has 100mm MOT thats 100mm of difference to make up with the sand, which is not acceptable. The sand would sink, no matter how much you run the plate over the top of it. Its just too deep.
Its all about keeping things uniform. if you screw up your levels at the start, the whole job can just fall to pieces around you.
-