Hello All,

Advice on the following would be much appreciated. I had my drive tarmaced in the summer. During the hot weather I noticed scuff marks due to wheel turnings. I approached the contractor and he said you cannot avoid these.

On looking through some photographs I found a photo of the drive when the sub base had been laid. The next photo I have is when the driveway was completed. As far as I can recall the final layer was laid in one day. So I am suspecting the base layer was not laid and all I got was a 50mm wearing layer on top of the sub base.

So my questions are: is it possible to lay a base layer and a wearing course in one day (on a hot day) and what impact would there be if the base layer had not been laid and all I got was a sub base and wearing layer.
Faheem Anwar

MatthewWakeman
Posts: 70
Joined: Sat Jan 07, 2006 9:38 am
Location: West Midlands

Post: # 15551Post MatthewWakeman

thats the ideal way of working it makes for a very tight bond between the base and the wearing course. scuff marks are not that uncommon in hot weather especially on newly laid bit mac

regards

matthew
drivewaycompany.co.uk

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 15554Post Dave_L

Can confirm that is the best way to do the job.

What was the spec of the surface course? Did you get a full spec?

These power steering marks/scuffs can be a big problem, but we always inform our customers of this potential problem.

After a couple of years or so after laying, the surface course seems much more resistant to tyre scuffing.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 15555Post Dave_L

To answer Q2 - this would be a most unacceptable situation - is the driveway still nice and level with no dips/puddles etc?
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

TarmacLady
Posts: 219
Joined: Fri Jan 23, 2004 9:55 pm
Location: Florida, USA

Post: # 15557Post TarmacLady

Scuffing occurs in hot weather because the tarmac goes soft at about 130F/50C -- easily reachable on a hot day, as the black surface absorbs heat like a sponge. Power steering exacerbates the problem.

It gets less and less as the surface ages (over a few seasons) because the volatile oils evaporate out of the mixture, leaving the harder solids (that have a higher melt point)...but this will change over time, as well, as a drive that has not been re-sealed (with an *bitumen* based sealer -- either solvent-based or emulsion will work, and not a latex emulsion!) will evenutally begin to break down, as there's not enough to bind the pebbly bits together anymore.

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 15568Post Dave_L

There is a big bearing on the spec of the material versus it's resistance to scuffing - the latest SMA bitmacs are far superior in this respect.

It's what we specify on 90% of our residential driveway work.

It also depends which quarry it comes from and at what time of day, but that's a story for another day! :cool:
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

faheem
Posts: 2
Joined: Tue Aug 01, 2006 5:05 pm
Location: Swanley

Post: # 15741Post faheem

The driveway is level, with two minor dips (just where the car front wheels stop). The contractor did say that overtime it will harden. However, I am still unclear on whether I should have got a subbase+base+wearing layers, beacuse the information on this site suggest tarmac should be laid in three layers and I am suspecting that only two layers have been laid.
Faheem Anwar

Stuarty
Posts: 637
Joined: Sat Mar 18, 2006 7:35 pm
Location: Edinburgh

Post: # 15745Post Stuarty

the sub base will be MOT, not tarmac. A domestic drive should be subbase + base course + wearing course. So the subbase would be MOT, then a base course and finally a wearing course.

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 15751Post Dave_L

Full road construction [tarmac] is laid in three layers, being road base, base, then surface.

Yoru driveway, as Stu has said is compacted stone, 20mm base and your choice of surface course.

Not sure I'd be happy leaving my customer with 'minor dips' where their car wheels rest! That suggests poor sub base preparation......
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset