I am building a double garage about 6m x 5.5m and have got as far as digging and filling the trench filled 450mm wide strip foundation. I have set the height at 300mm below dpc.
I have a difference in height around the foundations of about 2 cm, and would like to know if this an acceptable error to rectify by altering the mortar thickness?
I was going to use 140mm high blocks up to ground level but have since found out the blocks I was going to use are no longer made and the alternatives may take a week or so for delivery. If I use facing bricks up to dpc, would they be able to cope with the height difference on the foundations as well as blocks, where the load would be spread over a larger area?
And would it be alright if I put blocks on top of facing bricks, because I know they expand and contract in different ways.

Also I would like to know the best hardcore to use for the concrete floor - I was going to use MOT type 1.

Sorry for all the questions.
Many thanks.

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 14906Post lutonlagerlout

you rough sod matt
20mm out in 300mm is do-able but if it is 20 low you will need some stiff mortar
if it is 20 high some wet mortar
why oh why cant ppl get concrete level in foundations??
its so easy ,then the whole job just whizzes up i suggest putting some datums in on each corner so the brickie has something to work to
cheers LLL
:)
"what,you want paying today??"

YOUR TEXT GOES HERE

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 14908Post lutonlagerlout

you rough sod matt

sorry should read "you rough sod trevor"
brains gone wobbly again
cheers LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 14915Post Dave_L

This is pretty much what we'll be doing Monday next - hooking out the footings for an extension to a nursing home and pouring the founds. Not really something I have done much with really, so looking foward to it. Might even take me camera with me :angry:
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 14954Post lutonlagerlout

believe me dave,it makes live so much easier for everyone if the crete is level + or - 5mm.
groundworkers do it all the time to me "just cut a few blocks round that hump mate" "we had .5 of crete left over so we had to use it" "does it really matter if its not level?"
and the coup de grace "i leveled it with a rake" one corner was 40mm high on this job
regards LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

TrevorL
Posts: 28
Joined: Fri Oct 13, 2006 6:48 pm
Location: West Sussex

Post: # 14996Post TrevorL

Many thanks for the advice.
It was a bit of a rush to put the concrete in and I should have had more help.
Have any of you ever used a device called a "Bricky"? It's used to lay the mortar at the correct thickness - if I don't get on with it I will have to hire a real bricky.

All the best
Trevor

Stuarty
Posts: 637
Joined: Sat Mar 18, 2006 7:35 pm
Location: Edinburgh

Post: # 14999Post Stuarty

Is that the bar type thing with a gap that sits on the wall and you basically screed the mortar along it ?

Brickwork is all about taking your time if your a novice. Brickies take a long time to perfect their art.

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 15001Post lutonlagerlout

if you want to lay 100 bricks a day the "brickie" is ok,realistically hire a bricklayer for a day and a labourer and watch 800-1000 bricks go in nice and straight
cheers LLL :laugh:
"what,you want paying today??"

YOUR TEXT GOES HERE

TrevorL
Posts: 28
Joined: Fri Oct 13, 2006 6:48 pm
Location: West Sussex

Post: # 15013Post TrevorL

Yes, it is the bar type with a gap in the middle.
The only problem I could imagine is the tolerance on the length of the brick. A good bricklayer would alter the mortar thickness to cope with this but with the "Bricky" you are stuck with a 10mm joint!
If I don't get on with it I will hire a bricklayer.

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 15020Post lutonlagerlout

better to use profiles trevor, i have laid 100's of thousands of bricks and believe me they are not all 100% straight.
any minor defect will be magnified by the brickie, btw a bricklayer in your part of the world should cost 130-160 a day as a rough guide
cheers LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

TrevorL
Posts: 28
Joined: Fri Oct 13, 2006 6:48 pm
Location: West Sussex

Post: # 15123Post TrevorL

Many thanks for that. I will take your advice and use profiles as well.
The weather hasn't been that good recently so I haven't made any progress. Idealy I need a couple of dry days before I start laying the foundation blocks and correct the height errors.
If I'm not happy with my progress or quality of my work I will definitely employ a real bricky.

All the best
Trevor

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 15132Post Dave_L

lutonlagerlout wrote:believe me dave,it makes live so much easier for everyone if the crete is level + or - 5mm.
groundworkers do it all the time to me "just cut a few blocks round that hump mate" "we had .5 of crete left over so we had to use it" "does it really matter if its not level?"
and the coup de grace "i leveled it with a rake" one corner was 40mm high on this job
regards LLL
Been digging and pouring concrete into the foundations today for a large extension to a care home today (day 2) - I was mindful of your post LLL!

Better to be a little bit low than too high with the concrete though.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Ted
Posts: 585
Joined: Tue Aug 29, 2006 9:02 pm
Location: Luanda, Angola

Post: # 15134Post Ted

Type 1 is the best for your sub-base IMO.

I'm a concrete person not a brickie. My view would be that if you messed up the foundations by 2cm, I would get a pro in for the brickwork. Not only have you got to overcome the 2cm now, but you want the brickwork to look excellent; no-one is going to see your foundation mistake.

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 15147Post lutonlagerlout

Better to be a little bit low than too high with the concrete though.

this is a common mistake dave,maybe for floors driveways and roads but with BWK you are normally in the gound anyway so the first 4 courses wont be seen
i'm sure your crete will be spot on dave
cheers
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 15218Post seanandruby

ive seen some rough concrete foundations. usually because some groundworkers use for levels, nails, spray paint even guess work. i find lamp irons ( thats road pins to you ) knocked in the footings do the levels using coloured tape. make the level bottom of tape so that when you pore the crete the tape is still showing above . when complete smooth off so theres no high points, then hook pins out with shovel smooth pinholes job done. hope this helps first timers.