Garage floor slab & pit

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
Scorpio
Posts: 2
Joined: Thu Jun 29, 2006 12:56 am
Location: Cheshire

Post: # 12675Post Scorpio

Hi guys
I am about to build a garage 20' x 30' and want to incorporate a concrete pit approx 12'L x 3'6"W x 4'D, so I can sit on a stool.
I intend to lay a sub base of approx 4" MOT then DPC the 4" of concrete with a re-inforcing mesh at half depth.
My question is how do I do construct the pit and when in the construction phase?
I am a reasonably good DIYer but don't necessarily know 'building terms' so please explain fully.
Thanks
Scorpio
Pisces

Scorpio
Posts: 2
Joined: Thu Jun 29, 2006 12:56 am
Location: Cheshire

Post: # 12691Post Scorpio

Hello
Someone out there must have had to do this before - I am getting closer to getting the sub base down but dont want to do something stupid that is a lot of effort/cost to change.
Please help.
Thanks
Scorpio :( :(
Pisces

Stuarty
Posts: 637
Joined: Sat Mar 18, 2006 7:35 pm
Location: Edinburgh

Post: # 12699Post Stuarty

sounds like your best option would be constructing the pit with blockwork. Lay the blocks on their side, because there is fair bit of concrete needed for that floor. Basically dig out the pit area, get all founds etc in for it, and build your blockwork. Build it to the finished height of the concrete. Once the blockwork is done, leave it for a couple of days, and get the surrounding area prepared for the concrete. Once your happy the wall can take the weight, its time to call in the jigger :D

Alternatively, you can construct the pit with shuttering, dig your hole, but to be honest, i prefer blockwork, mainly becuase i have done all too much shuttering, someone else may have a better idea of what you would need to do :)

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 12802Post seanandruby

dont forget to rebate arond the top so you can cover pit when not in use. also allow for a sump hole in the base.also ducting for cable etc.
sean

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 12862Post Tony McC

You build the pit first, then cast the slab around it. As Stuarty said, used dense CMUs or 225mm Engineering brickwork for the pit. It is possible to cast the pit as part of the slab, but it's not a job I'd recommend for a DIYer, unless you were completely at home with formwork.
Site Agent - Pavingexpert

Post Reply