I have a brick paver bar apron bedded and jointed with sand cement mortar on polymeric screed with UFH. The jointing is failing widely. I'm thinking the UFH may have been on and dried out the jointing before it cured fully leading to the general failure?
Does anyone have any ideas for a solution that doesn't involve re-doing the full depth of the jointing - and possibly allows for a little more movement than sand cement mortar. It's a bar walk so ideally it needs to be durable and cure quickly so the pub doesn't have to shut.
Brick paving on underfloor heating
-
- Posts: 889
- Joined: Fri Jan 18, 2008 9:32 pm
- Location: cheshire
-
- Posts: 2
- Joined: Fri Jul 12, 2019 5:31 pm
- Location: London
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact: