Hi there everyone, i am new to this forum. i come from Canada.
recently, i have hired a contractor to put up a retaining blocks stairs for me. the retaining blocks are solid blocks. He has finished the cutting and dry fitting. And then he left the job. the step blocks are not adhered to the retaining blocks yet. when i walk or step on it, it wobbles. He told me on the phone that, put some landscape block adhesive between them, then it would be stable and secure.
i doubt it, what do you guys think?
i am thinking about using thin-set to settle these step blocks? haha
Also, there are big gaps between each riser and steps. He told me to fill it with cement and sand mix. Is that how you guys would do it?
anyway input would be nice. Thanks
Retaining blocks stairs - Best way to install the retaining blocks
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
I really, *really* don't like that construction!
The tread blocks are only held in position (if that's the right term) by a tongue-and-groove joint. Should anyone step on the outer edge of the tread, what's to stop it lifting at the back and coming off the riser block completely?
It looks very much like an accident waiting to happen!
That gap between tread and subsequent riser is worrying. Surely, that can't be right! WE have similar system in Europse, but they are used solely for walling NOT for steps, but even with walling, there is no place for such gaps.....unless the setting-out was wrong to start off with!
And why the hell should *you* have to carry out remedial work to a newly-constructed step? What is this contractor being paid to do, at all? Get the lazy, slipshod bugger back to build it properly or reimburse whatever you paid him!
The tread blocks are only held in position (if that's the right term) by a tongue-and-groove joint. Should anyone step on the outer edge of the tread, what's to stop it lifting at the back and coming off the riser block completely?
It looks very much like an accident waiting to happen!
That gap between tread and subsequent riser is worrying. Surely, that can't be right! WE have similar system in Europse, but they are used solely for walling NOT for steps, but even with walling, there is no place for such gaps.....unless the setting-out was wrong to start off with!
And why the hell should *you* have to carry out remedial work to a newly-constructed step? What is this contractor being paid to do, at all? Get the lazy, slipshod bugger back to build it properly or reimburse whatever you paid him!
Site Agent - Pavingexpert
-
- Posts: 3
- Joined: Sat Sep 08, 2018 9:14 am
- Location: canada
-
- Posts: 3
- Joined: Sat Sep 08, 2018 9:14 am
- Location: canada
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne