Patio flagstones (slabs), concrete flags, stone flags including yorkstone and imported flagstones.
-
Forestboy1978
- Posts: 1000
- Joined: Sun Oct 23, 2011 9:57 am
- Location: southampton, hampshire
Post: # 113937Post
Forestboy1978
Just wondering if it might be quicker to screed a mortar bed for calibrated concrete casts rather than individually laying them to a level.
Any thoughts?
-
Forestboy1978
- Posts: 1000
- Joined: Sun Oct 23, 2011 9:57 am
- Location: southampton, hampshire
Post: # 113945Post
Forestboy1978
Oh yeah I'm talking about a wet bed cos the casts are 600mm x 600mm
Need to find out a way to get out of this one ASAP and on to the next. Bit skint at the moment.
-
seanandruby
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
Post: # 113970Post
seanandruby
Never works with wet bed screeding, individual all the way. If your skint then surely you need to do the job ???
sean