Joint balancing and alignment
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk
Can anyone offer magic tips to get joint balancing and alignment right from the start and hopefully avoid having to nudge flagstones around?
Laying random five size pattern.
Going to use SBR on the backs so little bit apprehensive if my flagstones need nudged a little bit and stuffs lost its adhesion after nudging around.
All previous advice has been much appreciated, so hopefully I can get more.
Thanks
Laying random five size pattern.
Going to use SBR on the backs so little bit apprehensive if my flagstones need nudged a little bit and stuffs lost its adhesion after nudging around.
All previous advice has been much appreciated, so hopefully I can get more.
Thanks
Mucho gracias
-
- Posts: 889
- Joined: Fri Jan 18, 2008 9:32 pm
- Location: cheshire
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk
Yes. I think I'll layout flagstones dry to get a feel for joint width.
I'd love it if I could get a perfect 10 or 12mm joint width through my patio, but is it realisticly possible.
I appreciate theres a lot of variables that are hard to account for but if a top notch contractor laid a patio what would be there parameters for joint width and at what point does the variation in joint width become unacceptable? I reckon if I had a target width of 12mm but that could go to 9mm or 15mm I'd be chuffed to bits.
Have I been looking at too many catalogue photos? Am I being unrealistically ambitious?
I'd love it if I could get a perfect 10 or 12mm joint width through my patio, but is it realisticly possible.
I appreciate theres a lot of variables that are hard to account for but if a top notch contractor laid a patio what would be there parameters for joint width and at what point does the variation in joint width become unacceptable? I reckon if I had a target width of 12mm but that could go to 9mm or 15mm I'd be chuffed to bits.
Have I been looking at too many catalogue photos? Am I being unrealistically ambitious?
Mucho gracias
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
hard to explain in words but hopefully you will grasp it ......
use plenty of steel line pins and nylon lines.. buy a 1800mm long level and a 1 metre long level .. either learn about 3:4:5 or buy a foldable aluminium square
check a few flags for size and lets say they vary from 595mm to 602mm so there is 7mm difference and you are after a 10mm - 12mm consistent joint width ... just bare in mind this is not always possible with riven paving
if your lines are set to 610mm then some joints will be 8mm wide and other joints will be 15mm wide, you might find that certain flags will touch each other but you can cut them to give you a gap for the joint once the bedding has gone hard (or they can be cut prior to laying too)
please note... I have used 610mm gauge for your lines as an example...
use plenty of steel line pins and nylon lines.. buy a 1800mm long level and a 1 metre long level .. either learn about 3:4:5 or buy a foldable aluminium square
check a few flags for size and lets say they vary from 595mm to 602mm so there is 7mm difference and you are after a 10mm - 12mm consistent joint width ... just bare in mind this is not always possible with riven paving
if your lines are set to 610mm then some joints will be 8mm wide and other joints will be 15mm wide, you might find that certain flags will touch each other but you can cut them to give you a gap for the joint once the bedding has gone hard (or they can be cut prior to laying too)
please note... I have used 610mm gauge for your lines as an example...
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
the long one will span over a longer distance and the shorter one is easier to use from flag to flag... I have 4 different lengths levels and some days they are all in use
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
this patio and paths was 5 different sizes but laid in a coursed pattern rather than a random laying pattern
riven paving in a coursed laying pattern
riven paving in a coursed laying pattern
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
can you see how tight the joints are ..... its easier on a coursed laying pattern as you can vary the line gauge to suit a row of flags where as with the random laying pattern you are governed by what you have already laid
I look forward to seeing the finished patio
I look forward to seeing the finished patio
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
a couple of images of the finished project ... well done it looks good buddy
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk
LLL,
Was thinking of using DANGERPOINT, ie, sand, cement + SBR.
I've got maybe four litres spare and I don't see me needing it in future. I got quoted £46 a tub for weather point so that could be £230. My friend had patio laid recently with a sweep in product and I've looked at it and its like there's been some shrinkage and in some places its like a hairline fracture between pointing product and paving, no weeds yet but they can't be far away. Also visually I wasn't that keen on it although he couldn't confirm what was used.
Got cement too so all I need is some 25kg bags building sand. So outlay for sand cement pointing maybe tenner max compared to weather points £184 min, prob £230.
The whole time I laid patio I had bucket clean water and paint brush by my side, didn't use it too much, but I was glad I had and it worked well when I needed it. Would probably do same again. I understand its risky but I reckon if im carefull I can do it.
Need a trip to garden centre too for nice pots and stuff to fill them so wouldn't mind saving a bit on pointing gear.
What do you reckon?
Was thinking of using DANGERPOINT, ie, sand, cement + SBR.
I've got maybe four litres spare and I don't see me needing it in future. I got quoted £46 a tub for weather point so that could be £230. My friend had patio laid recently with a sweep in product and I've looked at it and its like there's been some shrinkage and in some places its like a hairline fracture between pointing product and paving, no weeds yet but they can't be far away. Also visually I wasn't that keen on it although he couldn't confirm what was used.
Got cement too so all I need is some 25kg bags building sand. So outlay for sand cement pointing maybe tenner max compared to weather points £184 min, prob £230.
The whole time I laid patio I had bucket clean water and paint brush by my side, didn't use it too much, but I was glad I had and it worked well when I needed it. Would probably do same again. I understand its risky but I reckon if im carefull I can do it.
Need a trip to garden centre too for nice pots and stuff to fill them so wouldn't mind saving a bit on pointing gear.
What do you reckon?
Mucho gracias
-
- Posts: 27
- Joined: Fri Sep 09, 2016 4:23 pm
- Location: Uk